Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit I Renewal Of Damaged Hp Valves And Worn Out Boiler Tubes In Steamfeed Water Lines Of Boiler During The Overhaul 20242025
|
Description |
Ttps Mech Ii Bm Unit I Renewal Of Damaged Hp Valves And Worn Out Boiler Tubes In Steamfeed Water Lines Of Boiler During The Overhaul 20242025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_461864_1 |
Reference Number |
CE/TTPS/SE/M-II/No.368/2024-25 |
Tender Fee | 0 |
EMD | 5100 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=548864 |
Start Date | July 10, 2024 23:30 |
End Date |
26/07/2024 ( Expired 270 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Work of hammering and poking of coal bunker in all three shift during rainy season in unit 1,2,3 and 4 of ph-i n ph-ii at sstpp, mppgcl, dongalia, dist. khandwa
Read moreThermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Read moreAnnual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Read moreSpl repair to bldg no t-3 of certain unit and water pipe lines of new amn dump at age b/r ii and age e/m under ge babina cantt
Spl repair to bldg no t-3 of certain unit and water pipe lines of new amn dump at age b/r ii and age e/m under ge babina cantt
Read moreSupply of certain spares for bhel make motor operated valves installed in feed water path and deaerator and hp heater extraction lines
Supply of certain spares for bhel make motor operated valves installed in feed water path and deaerator and hp heater extraction lines
Read moreOverhauling of flue gas damper assembly of aph inlet/primary air/secondary air, servicing of esp inlet gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the capital overhauling of unit6 of 2x250mw
Overhauling of flue gas damper assembly of aph &#x0d inlet/primary/secondary air, servicing of esp inlet &#x0d gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the &#x0d capital overhauling of unit6 of 2x250mw
Read moreThermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 or 8, dpps during overhauling period.
Thermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 or 8, dpps during overhauling period.
Read moreWork contract for replacement of worn out / eroded vacuum and hp water line for ash handling system in 210 mw atps mppgcl chachai.
Work contract for replacement of worn out / eroded vacuum and hp water line for ash handling system in 210 mw atps mppgcl chachai.
Read moreTn-5383 capital and routine maintenance of boiler pressure part area (hp/lp welding of boiler/turbine area, hp/lp valves, soot blowers and its 11associated works) of unit 1 to 7 kstps, kota
Capital and routine maintenance of boiler pressure part area (hp/lp welding of boiler/turbine area, hp/lp valves, soot blowers and its 11associated works) of unit 1 to 7 kstps, kota
Read moreEddy current testing and fluorescent test of all condenser tubes at unit 1 during overhauling in aug 2025
Eddy current testing and fluorescent test of all condenser tubes at unit 1 during overhauling in aug 2025
Read moreof your Industry type