Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Construction Of Self Drain For Avoiding Water Stagnation In Shangumugham Veli Road Ch 1850 2050 And 2500 Phase 2 General Civil Work
|
| Description |
General Construction Of Self Drain For Avoiding Water Stagnation In Shangumugham Veli Road Ch 1850 2050 And 2500 Phase 2 General Civil Work
|
| Organisation | PWD | Chief Engineer (Roads and Bridges) | SE Roads (S) | EE Roads (TVM) |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 2760 |
| EMD | 50000 |
| Tender Value | 21.19 Lakh |
| Place | Kerala |
| Link | Login to view |
| Start Date | October 08, 2026 21:00 |
| End Date |
Closing soon
13/10/2026
0 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Contract package-p1- partial and full demolition/dismantling of buildings/structures identified from jp nagar 4th phase station to mysore road station (from ch. (-) 0.330 km to ch. 10.550 km) in corridor-1 of bangalore metro rail project phase-3.
Contract package-p1- partial and full demolition/dismantling of buildings/structures identified from jp nagar 4th phase station to mysore road station (from ch. (-) 0.330 km to ch. 10.550 km) in corridor-1 of bangalore metro rail project phase-3.
Read moreDistribution transformer, 3 phase, 11 kv, >200 kva upto and including 2500 kva isi marked to is 1180 (part 1)
Distribution transformer, 3 phase, 11 kv, >200 kva upto and including 2500 kva isi marked to is 1180 (part 1)
Read moreDistribution transformer, 3 phase, 11 kv, >200 kva upto and including 2500 kva isi marked to is 1180 (part 1)
Distribution transformer, 3 phase, 11 kv, >200 kva upto and including 2500 kva isi marked to is 1180 (part 1)
Read moreLaying of 33 kv 1 x 630 sq mm xlpe ug cable for second source of poonamallee mtc depot ev station from porur srmc 110 kvss reach i ch 0 to 2500 m route length 2500 m
Laying of 33 kv 1 x 630 sq mm xlpe ug cable for second source of poonamallee mtc depot ev station from porur srmc 110 kvss reach i ch 0 to 2500 m route length 2500 m
Read moreLaying of 33 kv 1 x 630 sq mm xlpe ug cable for second source of poonamallee mtc depot ev station from porur srmc 110 kvss reach ii ch 2500 to 5000 m route length 2500 m
Laying of 33 kv 1 x 630 sq mm xlpe ug cable for second source of poonamallee mtc depot ev station from porur srmc 110 kvss reach ii ch 2500 to 5000 m route length 2500 m
Read moreSteel sheet to is: 513: 2008 (latest issue) to grade cr2 or cr3 to size 2050 x 1250 x 2 mm thickness o,steel to bs 1449 pt. 1: 1983, sec. 2, grade: 4 or is: 513-1973 grade: dd to size 2050 x 1250 x thickness,steel sheet grade hs 17, sec. -4 to bs 1449, pt-1: 1983 to size: 1000 x 2500 x 4 mm thickness.,steel sheet to grade hs 17, sec. : 4 to bs 1449, pt. -1: 1983 to size: 1000 x 2500 x 3 /- 0.22 mm thick,steel sheet to bs 1449, pt. -1: 1983 grade: hs 20 p or is: 1079: 1980 gd. : fe 410 to size: 1000 x 2500 x
Steel sheet to is: 513: 2008 (latest issue) to grade cr2 or cr3 to size 2050 x 1250 x 2 mm thickness o,steel to bs 1449 pt. 1: 1983, sec. 2, grade: 4 or is: 513-1973 grade: dd to size 2050 x 1250 x thickness,steel sheet grade hs 17, sec. -4 to bs 1449, pt-1: 1983 to size: 1000 x 2500 x 4 mm thickness.,steel sheet to grade hs 17, sec. : 4 to bs 1449, pt. -1: 1983 to size: 1000 x 2500 x 3 /- 0.22 mm thick,steel sheet to bs 1449, pt. -1: 1983 grade: hs 20 p or is: 1079: 1980 gd. : fe 410 to size: 1000 x 2500 x
Read moreContract package-p3- partial and full demolition/dismantling of buildings/structures identified from sumanahalli station (excl) to kempapura station (excl) (from ch. 17.695 km to ch. 30.866 km) in corridor-1of bangalore metro rail project phase-3.
Contract package-p3- partial and full demolition/dismantling of buildings/structures identified from sumanahalli station (excl) to kempapura station (excl) (from ch. 17.695 km to ch. 30.866 km) in corridor-1of bangalore metro rail project phase-3.
Read moreAnnual operation and comprehensive maintenance of vrv system 76 hp ac plant installed at ctu complex industrial area phase i, chandigarh (ch. to 2215 (np) (p) nrb)
Annual operation and comprehensive maintenance of vrv system 76 hp ac plant installed at ctu complex industrial area phase i, chandigarh (ch. to 2215 (np) (p) nrb)
Read moreLaying of 33 kv 1 x 630 sq mm xlpe ug cable for second source of poonamallee mtc depot ev station from porur srmc 110 kvss reach iii ch 5000 to 7500 m route length 2500 m
Laying of 33 kv 1 x 630 sq mm xlpe ug cable for second source of poonamallee mtc depot ev station from porur srmc 110 kvss reach iii ch 5000 to 7500 m route length
Read moreSdp sabarimala-improvementsto the yard of staff quarters and works for avoiding water stagnation.
Sdp sabarimala-improvementsto the yard of staff quarters and works for avoiding water stagnation.
Read moreof your Industry type