Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Execution Of Ballast Less Track At Puri Station Yard For Platform No:7 &Amp 8 Under Kur Division Of East Coast Railway
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79223869 |
|
Reference Number |
ETCECONIIIBBS2024057 |
| Tender Fee | 0 |
| EMD | 6.54 Lakh |
| Tender Value | - |
| Place | Bhubaneswar |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79223869/viewNitPdf_4817068.pdf |
| Start Date | December 27, 2024 23:40 |
| End Date |
Expired
28/01/2025
Expired 625 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Execution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode
Execution of ballast less track works from shivalingapuram station km. 45.483 to borraguhalu station km. 72.550 in connection with kottavalasa koraput doubling project of rayagada division, east coast railway on epc mode
Read moreDismantling of ballast less track of oil decanting rail siding in sstpp, dongalia for gct-i.
Dismantling of ballast less track of oil decanting rail siding in sstpp, dongalia for gct-i.
Read moreProvision of ballast less track at nanded station. (trail of new design of blt-ifs for speed up to 130kmph-road2-720m).
Provision of ballast less track at nanded station. (trail of new design of blt-ifs for speed up to 130kmph-road2-720m).
Read moreComprehensive amc for hitachi make electronic interlocking ei stationof track hopper control room central yard east cabin east m3 yard west cabin west m4 yard of wagon tippler line at ntpc sipat for twoyears 2026 28
Comprehensive amc for hitachi make electronic interlocking ei stationof track hopper control room central yard east cabin east m3 yard west cabin west m4 yard of wagon tippler line at ntpc sipat for twoyears 2026 28
Read moreP.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
Read moreSupply of 1,00,000 cum 50mm size machine crushed track ballast as per rdso specification for b. g. railway track & loading the same into any type of railway wagons f.o.r sakrigali including all sorts of incidental charges for east central railway.
Supply of 1,00,000 cum 50mm size machine crushed track ballast as per rdso specification for b. g. railway track & loading the same into any type of railway wagons f.o.r sakrigali including all sorts of incidental charges for east central railway.
Read moreExecution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Execution of earthwork in formation, minor bridges, major bridges, station buildings, service buildings, p-way linking work, ballast supply, platform work , pf shelter, drain work, camping facilities, protection works, tunnel between ch: 116.205 km to ch: 116.415 km, and other allied works between barkote(ex) (ch: 98.325 km) - mahuldiha(ex) (ch: 117.525 km) including ambagaon yard in connection with talcher - bimalagarh new bg rail link project.
Read more1) solapur division- various types of track works under the yard improvement umbrella at shendri, barshi town, pajari, dharashiv, yedshi, dhoky, ausa road, harangul, latur, modlimb, pandharpur, sangola, jath road, dhalgaon, kavathe mahankal, salgare & arag yard. 2)yard imp works like trr, tfr, tbr and ttr (tws) in pr lines for brb, jeur, ppj, prwd, wka along with lur, hgl, osa and bot yard.3) twr work in kwv-sei 13.2 km under aden/lur sub-division in sur division. 4) execution of fb weldin
1) solapur division- various types of track works under the yard improvement umbrella at shendri, barshi town, pajari, dharashiv, yedshi, dhoky, ausa road, harangul, latur, modlimb, pandharpur, sangola, jath road, dhalgaon, kavathe mahankal, salgare & arag yard. 2)yard imp works like trr, tfr, tbr and ttr (tws) in pr lines for brb, jeur, ppj, prwd, wka along with lur, hgl, osa and bot yard.3) twr work in kwv-sei 13.2 km under aden/lur sub-division in sur division. 4) execution of fb weldin
Read more(a)csmt- provision of infrastructure facilities for quick watering system at all platform from pf no. 8 to 18 and ms-7 at csmt for cog. depot .( irpsm id- 01.02.42.25.4.51.003) (b)repairing and replacement of old pipelines at wadibunder yard under sse/w/wb. (c)csmt- improvement of east & west side circulating area of gm building at csmt.
(a)csmt- provision of infrastructure facilities for quick watering system at all platform from pf no. 8 to 18 and ms-7 at csmt for cog. depot .( irpsm id- 01.02.42.25.4.51.003) (b)repairing and replacement of old pipelines at wadibunder yard under sse/w/wb. (c)csmt- improvement of east & west side circulating area of gm building at csmt.
Read moreConstruction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Construction of platforms, earthwork/ blanketing in formation/cutting, retaining wall & drain, rub, fob, minor bridge (br.no.466/2, 467/1, 467/2, 467/3, 467/4, 467/4, 468/1, 468/2, 469/1), station building(g+1) and station building compound wall, water tank, toilet, rub pump house, road, etc. work and dismantling and track works for nimbhora yard remodelling, including ballast supply in connection with bsl-knw 3rd and 4th line (131km) project of central railway. (two packet system).
Read moreof your Industry type