Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design Supply Installation Testing And Commissioning Of Solar Pv System With D G Set And Trial And Run Of Solar Power Plant For 03 Months At Sohan Tau Ashram Mps And Lal Mahadev Ips At Anoopshahar Distt Bulandshahar
|
| Description |
Design Supply Installation Testing And Commissioning Of Solar Pv System With D G Set And Trial And Run Of Solar Power Plant For 03 Months At Sohan Tau Ashram Mps And Lal Mahadev Ips At Anoopshahar Distt Bulandshahar
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_UPJNM_831355_1 |
|
Reference Number |
NIT No. 1833 / Vividh-7 / 177 Dated 17-08-2023 |
| Tender Fee | 3540 |
| EMD | 76000 |
| Tender Value | - |
| Place | EE CD EM UP JAL NIGAM (URBAN) GHAZIABAD |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | August 23, 2023 20:30 |
| End Date |
Expired
21/09/2023
Expired 1119 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply and supervision till trial run period of automatic power factor correction panels with associated electrical and mechanical works complete at mps in distt.ghaziabad under major replacement fund
Supply and supervision till trial run period of automatic power factor correction panels with associated electrical and mechanical works complete at mps in distt.ghaziabad under major replacement fund
Read moreSupply, installation, commissioning, testing and trial run of 40 kwp micro grid solar photo voltaic roof top solar power plant (on roof top of d block new guest house) in the residential colony
Supply, installation, commissioning, testing and trial run of 40 kwp micro grid solar photo voltaic roof top solar power plant (on roof top of d block new guest house) in the residential colony
Read moreEstimate for construction of one no solar powered standalone community water purification plant for uncovered habitation (population and arsenic concentration above 0.15 ppm up to 0.30 ppm include three month trial run, near roytul jame mosjid under
Estimate for construction of one no solar powered standalone community water purification plant for uncovered habitation (population and arsenic concentration above 0.15 ppm up to 0.30 ppm include three month trial run, near roytul jame mosjid under
Read moreName of the work aap no installation of community water purification plant at baluigachi paul para fp school with construction of solar powered standalone community water purification plant for uncovered habitations including 3 month trial run an
Name of the work aap no installation of community water purification plant at baluigachi paul para fp school with construction of solar powered standalone community water purification plant for uncovered habitations including 3 month trial run an
Read moreConstruction installation commissioning trial run and training of 01 one no solar powered cold storage of 15 fifteen mt capacity at cef centre of excellence for flower at lembucherra under west tripura district along with all necessary civil works li
Construction installation commissioning trial run and training of 01 one no solar powered cold storage of 15 fifteen mt capacity at cef centre of excellence for flower at lembucherra under west tripura district along with all necessary civil works li
Read moreof your Industry type