Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Reconstruction Opportunity For Compound Wall At Prothrapur 🛠️ The Chief Engineer, Andaman Public Works Department (Apwd), Invites Tenders For The Reconstruction Of A Compound Wall For A Length Of 245 Meters At Prothrapur, Under The Andaman & Nicobar Islands. 🌟 The Objective Is To Restore And Protect The Premises Of Pts, P Pur, Under The Central Public Works Department (Cpwd), Class 'D'. 📅 Bid Submission Deadline: July 19, 2024, 3:00 Pm Tender Security Money: Inr 91,450 Interested Contractors Must Submit Detailed Tenders, Including Cost Estimates, Construction Methodology, And Timelines, Adhering To The Specifications Outlined In The Tender Document. Keywords: Reconstruction, Compound Wall, Prothrapur, Andaman Public Works Department, Apwd, State Government, Ut, Tender, Construction Project| Particulars | Details |
|---|---|
| Title |
Re Construction Of Compound Wall For A Length Of 245 Mtrs To Restore The Damaged Portion Of Existing Compound Wall To Protect The Premises Of Pts, P Pur Under Cd I,A.P.W.D., Port Blair
|
| Description |
Re Construction Of Compound Wall For A Length Of 245 Mtrs To Restore The Damaged Portion Of Existing Compound Wall To Protect The Premises Of Pts, P Pur Under Cd I,A.P.W.D., Port Blair
|
| Organisation | Chief Engineer Andaman Public Works Department (APWD) | State Govt. and UT |
| Tender Id | 2024_APWD_14685_1 |
|
Reference Number |
13/NIT/DB/CD-I/PB/24-25 |
| Tender Fee | 0 |
| EMD | 91450 |
| Tender Value | - |
| Place | Prothrapur |
| Link |
View Original Tender Notice
https://eprocure.andaman.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=15527 |
| Start Date | July 03, 2024 21:30 |
| End Date |
Expired
19/07/2024
Expired 821 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing stone pitching inside existing pond area to protect soil erosion behind auditorium at dbrait campus under cd-i, a.p.w.d., port blair
Providing stone pitching inside existing pond area to protect soil erosion behind auditorium at dbrait campus under cd-i, a.p.w.d., port blair
Read moreReconstruction of collapsed compound wall portion on western side 33 mtrs of kothapeta po bldg under amalapuram dn
Reconstruction of collapsed compound wall portion on western side 33 mtrs of kothapeta po bldg under amalapuram dn
Read moreRe-surfacing of parking area including repair of damaged portion of compound wall, plinth and drains at transit accommodation, police line, port blair.
Re-surfacing of parking area including repair of damaged portion of compound wall, plinth and drains at transit accommodation, police line, port blair.
Read moreProviding external electrical installations and u.g cables to extended portion of walk way of qtr no. h-123 ty-v at horticulture road, haddo under section-iv of eandm sub division, workshop division, a.p.w.d, port blair
Providing external electrical installations and u.g cables to extended portion of walk way of qtr no. h-123 ty-v at horticulture road, haddo under section-iv of eandm sub division, workshop division, a.p.w.d, port blair
Read moreChain linked fencing aw top arrangement of g.i. barbed and concertina coil to protect the boundary at old collapsed portion of wall in bsnl telephone exchange compound at waidhan distt. singrauli mp
Chain linked fencing aw top arrangement of g.i. barbed and concertina coil to protect the boundary at old collapsed portion of wall in bsnl telephone exchange compound at waidhan distt. singrauli mp
Read moreConstruction of cc footpath with both side drain for a length of 43 mtrs with 03 mtr width starting from shri. ram baran ram house to shri. dhakan uraon house at birsa nagar attamphad ward no. 18, port blair under mplad scheme under cd-i, a.p.w.d., p
Construction of cc footpath with both side drain for a length of 43 mtrs with 03 mtr width starting from shri. ram baran ram house to shri. dhakan uraon house at birsa nagar attamphad ward no. 18, port blair under mplad scheme under cd-i, a.p.w.d., p
Read moreof your Industry type