Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Junction Improvement And Paved Shoulder And Misc. Civil Work For Master Plan And Coordination Road At Gandhi Nagar Airport And Central Jail To Dwarkadham Via Bypass Near Karond, Bhopal
|
| Description |
Junction Improvement And Paved Shoulder And Misc. Civil Work For Master Plan And Coordination Road At Gandhi Nagar Airport And Central Jail To Dwarkadham Via Bypass Near Karond, Bhopal
|
| Organisation | Capital Project Administration | State Govt. and UT |
| Tender Id | 2024_CPA_356228_1 |
|
Reference Number |
20/SAC |
| Tender Fee | 5295 |
| EMD | 44000 |
| Tender Value | - |
| Place | Bhopal |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=514587 |
| Start Date | July 12, 2025 00:00 |
| End Date |
Expired
23/07/2025
Expired 450 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)
Consultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)
Read moreConsultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)
Consultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreConsultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Consultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Read moreConstruction work of andhau chaukiya bypass road (two lane with paved shoulder) in distt ghazipur
Construction work of andhau chaukiya bypass road (two lane with paved shoulder) in distt ghazipur
Read moreOperation and maintenance of four lane with paved shoulder bhopal-biaora section from lalghati square km 315.725 to mubarakpur bhopal bypass km 324.000 pkg-i of nh46 in the state of mp
Operation and maintenance of four lane with paved shoulder bhopal-biaora section from lalghati square km 315.725 to mubarakpur bhopal bypass km 324.000 pkg-i of nh46 in the state of mp
Read moreConsultancy services for authority engineer for supervision of construction of two lane with paved shoulder of ambikapur bypass, sitapur bypass and pathalgaon bypass of ambikapur-pathalgaon nh-43 construction of ambikapur bypass ambikapur-ramanujganj
Consultancy services for authority engineer for supervision of construction of two lane with paved shoulder of ambikapur bypass, sitapur bypass and pathalgaon bypass of ambikapur-pathalgaon nh-43 construction of ambikapur bypass ambikapur-ramanujganj
Read moreof your Industry type