Title
Junction Improvement And Paved Shoulder And Misc. Civil Work For Master Plan And Coordination Road At Gandhi Nagar Airport And Central Jail To Dwarkadham Via Bypass Near Karond, Bhopal
Description
Junction Improvement And Paved Shoulder And Misc. Civil Work For Master Plan And Coordination Road At Gandhi Nagar Airport And Central Jail To Dwarkadham Via Bypass Near Karond, Bhopal
Organisation Capital Project Administration | State Govt. and UT
Tender Id 2024_CPA_356228_1
Reference
Number
20/SAC
Tender Fee 5295
EMD 44000
Tender Value -
Place Bhopal
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=514587

Start Date July 12, 2025 00:00
End Date
Expired 23/07/2025

Expired 450 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode

Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.

Read more
Construction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Consultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)

Consultancy services for preparation of detailed project report for development of bhopal-jabalpur 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh.(project corridor length-240 km approximately) (package-b)

Read more
Consultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)

Consultancy services for preparation of detailed project report for development of bhopal-gwalior 4-lane with paved shoulder greenfield access control corridor in the state of madhya pradesh. (project corridor length-320 km approximately) (package-a)

Read more
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas

Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas

Read more
Consultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.

Consultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.

Read more
Construction work of andhau chaukiya bypass road (two lane with paved shoulder) in distt ghazipur

Construction work of andhau chaukiya bypass road (two lane with paved shoulder) in distt ghazipur

Read more
Operation and maintenance of four lane with paved shoulder bhopal-biaora section from lalghati square km 315.725 to mubarakpur bhopal bypass km 324.000 pkg-i of nh46 in the state of mp

Operation and maintenance of four lane with paved shoulder bhopal-biaora section from lalghati square km 315.725 to mubarakpur bhopal bypass km 324.000 pkg-i of nh46 in the state of mp

Read more
Consultancy services for authority engineer for supervision of construction of two lane with paved shoulder of ambikapur bypass, sitapur bypass and pathalgaon bypass of ambikapur-pathalgaon nh-43 construction of ambikapur bypass ambikapur-ramanujganj

Consultancy services for authority engineer for supervision of construction of two lane with paved shoulder of ambikapur bypass, sitapur bypass and pathalgaon bypass of ambikapur-pathalgaon nh-43 construction of ambikapur bypass ambikapur-ramanujganj

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise