Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ms Shuttering Plate Of Size 2 Mtr X 0.4 Mtr,Ms Shuttering Plate 1 Mtr X 1 Mtr,Ms Shuttering Plate O
|
Description |
|
Organisation | Department of Defence | Ministry of Defence |
Tender Id | GEM/2025/B/6318274 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | June 12, 2025 15:21 |
End Date |
03/07/2025 ( Expired 8 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreConsultancy services for authority engineer for supervision of widening and improvement of shangshak-tengnoupal road pkg-1 and widening and improvement of shangshak-tengnoupal road pkg-3 of nh-102a into 2 lane with hard shoulder.
Consultancy services for authority engineer for supervision of widening and improvement of shangshak-tengnoupal road pkg-1 and widening and improvement of shangshak-tengnoupal road pkg-3 of nh-102a into 2 lane with hard shoulder.
Read moreSupply, installation, testing and commissioning of 217 feet (66 meter) high mast tri colour national flag of size 60 feet x 90 feet with complete design at deendayal port authority at kandla
Supply, installation, testing and commissioning of 217 feet (66 meter) high mast tri colour national flag of size 60 feet x 90 feet with complete design at deendayal port authority at kandla
Read moreDevelopment, operation and maintenance of wayside amenities of jodhpur ring road section of nh-125a in the state of rajasthan 2 o-m sitesnh-125a/karwar/ch. 73-620/lhs
Development, operation and maintenance of wayside amenities of jodhpur ring road section of nh-125a in the state of rajasthan 2 o-m sitesnh-125a/karwar/ch. 73-620/lhs
Read moreReplacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Replacement of unit auxiliary supply boards of machine no. 1 2 and 3 with 08 nos. 04 pole edo microprocessor based 0.4kv, 630a acbs and 18 nos. 32a, 06 nos. 63 a and 06 nos. 150a mccb switch disconnectors at matatila hydro power plant distt. lalitpur
Read moreSplit bush for cam wheel shaft of size 325 mm id x 350 mm od x 169 mm long as per drawing,bushing s
Read more
Construction of lab under pm shri for kendriya vidyalaya no 1, no 2 at af stn kalaikunda and kendriya vidyalaya ay af stn salua under ge af kalaikunda
Construction of lab under pm shri for kendriya vidyalaya no 1, no 2 at af stn kalaikunda and kendriya vidyalaya ay af stn salua under ge af kalaikunda
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreSale of balance dry fly ash of unit no 1 and 2 of
Sale of balance dry fly ash of unit no 1 and 2 of&#x0d 2x660 mw, obra c thermal power station, obra,&#x0d sonebhadra
Read moreof your Industry type