Tender Details
Particulars | Details |
---|---|
Title |
Work No 01 Construction Of New 10000 Lit Oht At Muthandipatti In Pudupatti Panchayat Of Budalur Block In Thanjavur District Under Jjm Savings 20 21 Tranche
|
Description |
Work No 01 Construction Of New 10000 Lit Oht At Muthandipatti In Pudupatti Panchayat Of Budalur Block In Thanjavur District Under Jjm Savings 20 21 Tranche
|
Organisation | Rural Development and Panchayat Raj Department | State Govt. and UT |
Tender Id | 2024_RDTN_457522_1 |
Reference Number |
RC No 091 2023 B3 Dated 20 06 2024 |
Tender Fee | 0 |
EMD | 8000 |
Tender Value | |
Place | Budalur |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=543958 |
Start Date | June 26, 2024 20:30 |
End Date |
02/07/2024 ( Expired 342 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreUnder the crif (honble cm announcement no. 265/2022), the work of strengthening of mori netwar sankari jakhol motor road (state highway no. 48) of mori development block of uttarkashi district through hotmix/fdr technology.
Under the crif (honble cm announcement no. 265/2022), the work of strengthening of mori netwar sankari jakhol motor road (state highway no. 48) of mori development block of uttarkashi district through hotmix/fdr technology.
Read moreUnder crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Read moreConstruction of bridge on pathri roh river at hettampur, km 3 of roshanabad-biharigarh motor road in the assembly constituency bhel ranipur in haridwar district under c.r.i.f
Construction of bridge on pathri roh river at hettampur, km 3 of roshanabad-biharigarh motor road in the assembly constituency bhel ranipur in haridwar district under c.r.i.f
Read moreConstruction of c.c. road work at nagar parishad barghat different ward (ward no. 01, 03, 06, 08, 11, 13), barghat
Construction of c.c. road work at nagar parishad barghat different ward (ward no. 01, 03, 06, 08, 11, 13), barghat
Read moreConstruction of critical care block at district hospital rupnagar under pm abhim scheme
Construction of critical care block at district hospital rupnagar under pm abhim scheme
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreDeployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Deployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Read moreof your Industry type