Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Left Over Ohe Modification Works In Connection With Provision Of Full Length Unloading Platform And Modification To Goods Unloading Lines At Kallayi Station.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75906493 |
|
Reference Number |
J-TRD-OT-24-25-05 |
| Tender Fee | 0 |
| EMD | 60700 |
| Tender Value | |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/082024/75906493/viewNitPdf_4620492.pdf |
| Start Date | July 17, 2024 20:40 |
| End Date |
Expired
12/08/2024
Expired 672 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreMs-vm - improvement to platform and allied works at nbk, mkk, mbm, sp, pza, mn, pv, tbms, prgl, vdr & upm stations under aden/tbm sub-division (including left over works of abss at gdy, stm, tlm, cmp & gi).
For complete deion and other details, please refer to tender
Read moreDay to day maint of distribution pipe lines including repair replacement of gi pipelines and connected works at mil stn gaya
Day to day maint of distribution pipe lines including repair replacement of gi pipelines and connected works at mil stn gaya
Read moreFireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Fireproofing works on structures and equipments in connection with composite work for avu unit (part-a) for panipat refinery expansion project (p25) of m/s. indian oil corporation limited
Read moreConstruction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Construction of bridge along with approach_additional approach and protection work over river maskrarao on nathmalpur to firozabad village road in distt saharanpur
Read moreDesign, supply, installation, testing and commissioning of panel interlocking based signalling system in connection with development of 3rd silo loading arrangement at lalmatia loading yard of ntpc limited.
Design, supply, installation, testing and commissioning of panel interlocking based signalling system in connection with development of 3rd silo loading arrangement at lalmatia loading yard of ntpc limited.
Read moreProviding survey, supply, design ,erection testing and comm. of 11 kv ht line, dtr with civil works for providing sop to ev charging station at hrtc bus stand joginder nagar in (e) section local under esd no i, hpsebl joginder nagar.
Providing survey, supply, design ,erection testing and comm. of 11 kv ht line, dtr with civil works for providing sop to ev charging station at hrtc bus stand joginder nagar in (e) section local under esd no i, hpsebl joginder nagar.
Read moreCo gos mess, sos mess, platoon office with ops room, quarter guard misc store, wt station office, mt shed, recreation hall with training shed, mi room and tradesmen shops at bop of 47th bn itbp in eastern ladakh ut situated at a height of 15600 fee
Co gos mess, sos mess, platoon office with ops room, quarter guard misc store, wt station office, mt shed, recreation hall with training shed, mi room and tradesmen shops at bop of 47th bn itbp in eastern ladakh ut situated at a height of 15600 fee
Read moreBalance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Balance work of retrofitting work of piped water supply scheme to achieve the target of jjm for supplying water at every doorstep through functional household tap connection in villages nakjhar kala and nakjhar khurd block -sihawal dst. sidhi
Read moreBeautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Beautification and improvement works at puducherry urban stretch from km.01.450 to km.03.520 in the project of puducherry tindivanam section of nh-32 (old nh-66)
Read moreof your Industry type