Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Operation Circle Mpm I Unit Ii Renewal Of Wornout Spool Piece By New Coal Pipe With Collar For Mill 2 A To 2 F
|
| Description |
Ttps Operation Circle Mpm I Unit Ii Renewal Of Wornout Spool Piece By New Coal Pipe With Collar For Mill 2 A To 2 F
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_452783_1 |
|
Reference Number |
CE/SE/O/TTPS/Spec.No.108/24-25 |
| Tender Fee | 0 |
| EMD | 2000 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=538956 |
| Start Date | June 07, 2024 23:30 |
| End Date |
Expired
13/06/2024
Expired 854 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Mtps i mill plant unit ii complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill 2a to 2f
Read moreMtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Mtps i mill plant unit ii overhauling of gravimetric feeders and clean out conveyor of mill 2a to 2f during aoh 2026 2027
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreTtps mech ii bm unit i replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Ttps mech ii bm unit i replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Read moreMtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil
Mtps i mill plant unit ii dismantling patch welding and assembling of mill outlet elbows orifices transition pieces fabrication of spool piece multiple port outlets etc and hard facing of vertical coal pipe 1mtr length after transition piece in mil
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Read moreTtps mechiibm unit iiirenewal of severely eroded parent duct plate in top side walls of aphab flue gas outlet duct and replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Ttps mechiibm unit iiirenewal of severely eroded parent duct plate in top side walls of aphab flue gas outlet duct and replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Read moreMtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Mtps i mill plant unit ii fabrication of various length of 40 nb cooling water pipe line with flanges and assembling in the cooler cover of mill 2a to 2f and dismantling of seal air fan motor and overhauling reassembling setting the alignment
Read moreTtps operation circle revenue mpm i unit iii renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 3a to 3f and providing supports for seal air fan discharge lines of 3a, 3b a
Ttps operation circle revenue mpm i unit iii renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 3a to 3f and providing supports for seal air fan discharge lines of 3a, 3b a
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreof your Industry type