Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Behbalpur Estimate For Aug Ren Of W S Scheme Including Fht Connection Under Jjm Cat 2
|
| Description |
Prov &Amp#X0d
Of Supplying Erection Testing And Commissioning Of Horizontal &Amp#X0d
Motor Pumping For Clear Water Having Head 50 M As Per &Amp#X0d
The Indicated Requirements Of Discharge In Lpm
|
| Organisation | Haryana Government | State Govt. and UT |
| Tender Id | 2025_HRY_452556_1 |
|
Reference Number |
9372 Amt. 4.16 Behbalpur |
| Tender Fee | 1680 |
| EMD | 8312 |
| Tender Value | - |
| Place | Behbalpur |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=532507 |
| Start Date | June 26, 2025 23:30 |
| End Date |
Expired
02/07/2025
Expired 473 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
At noq : electrical estimate for : raising of platform 2/3 as standard height & balance electrical work of noq station in connection with abss.
At noq : electrical estimate for : raising of platform 2/3 as standard height & balance electrical work of noq station in connection with abss.
Read moreConducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Conducting final location survey, traffic survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of bg line in connection with new railway line between dhamtari-gurur-balod (80 km).
Read moreCarrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Carrying out final location survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between anupgarh to bikaner (131.750km) and spur line from rojhri to khajuwala (54.875 km) of bikaner division of north western railway.
Read moreCctv camera,cat six cable wire,wire connection camera to nvr connector,wire connection camera to nvr including hardware work labour work,solar security light,lifting mechanism of solar security lights,lifting mechanism of twelve meters high mast led light,all new wiring from base to top wire of high mast led light,led food light,24v150w burshless motor reapir and wiring of boom barrier,remote censor of boom barrier,speed adjustment maintenance and repair barier sensor,barrier sonsor change including hardwark work,repair of hand held dragon light,repair and maintenance of fabricated view cutters of rain shelter by using gi colour quoted sheet,repair and maintenance of sentry post,repair and maintence of poe switch,repair and maintenance of ethernet media convertor
Cctv camera,cat six cable wire,wire connection camera to nvr connector,wire connection camera to nvr including hardware work labour work,solar security light,lifting mechanism of solar security lights,lifting mechanism of twelve meters high mast led light,all new wiring from base to top wire of high mast led light,led food light,24v150w burshless motor reapir and wiring of boom barrier,remote censor of boom barrier,speed adjustment maintenance and repair barier sensor,barrier sonsor change including hardwark work,repair of hand held dragon light,repair and maintenance of fabricated view cutters of rain shelter by using gi colour quoted sheet,repair and maintenance of sentry post,repair and maintence of poe switch,repair and maintenance of ethernet media convertor
Read moreDesktop cumputer,laptops,wi fi router dual band,ethernet switch 24 port,structured cabling in lab,internet and intranrt connectivity,registered domain at least 100 mb web,printer all in one mfd,digital web cam high resolution 3.1 mp or higher,smart interactive board,online ups 5 kva,crimping tools,network rack 4u for 24 port,digital multi meter 3.5 digit,screw driver set,usb mini dongle for bluetooth devices connection,head phone and mic set,sound system 2.1,external solid state hard disk 1tb,patch panel 24 port,lan tester utp cat 5 cable tester rj45,punching tool for punching rj45 socket with cat 5 cable,chair instructor,table instructor,dual desk for trainees standard,computer table,operator chairs without arms mounted on castor wheels adjustable height,air conditioner split type 2.0 ton,white board 4 x 6 feet,steel almirah 2.5mx1.20mx0.5m,fire extinguisher co2 2 kg,fire buckets standard size
Desktop cumputer,laptops,wi fi router dual band,ethernet switch 24 port,structured cabling in lab,internet and intranrt connectivity,registered domain at least 100 mb web,printer all in one mfd,digital web cam high resolution 3.1 mp or higher,smart interactive board,online ups 5 kva,crimping tools,network rack 4u for 24 port,digital multi meter 3.5 digit,screw driver set,usb mini dongle for bluetooth devices connection,head phone and mic set,sound system 2.1,external solid state hard disk 1tb,patch panel 24 port,lan tester utp cat 5 cable tester rj45,punching tool for punching rj45 socket with cat 5 cable,chair instructor,table instructor,dual desk for trainees standard,computer table,operator chairs without arms mounted on castor wheels adjustable height,air conditioner split type 2.0 ton,white board 4 x 6 feet,steel almirah 2.5mx1.20mx0.5m,fire extinguisher co2 2 kg,fire buckets standard size
Read more(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur
(a)part-i-detailed estimate of(a)ttr(fs+tws+wcmsc)=26 nos (1 in 8.5=17 nos, 1 in 12=9 nos) (b) ttr(ds)=16 nos, g.total =42 nos in itarsi-narkher section & part-ii-miscellaneous items in connection yard improvement up gradation work of passenger loop in 3 nos. barsali, dharakhoh and barbatpur yard in nagpur division. (b)nagpur division casual renewal of cs, cmsc, tws, ds & ttr(tfr). (c)nagpur division-casual renewal of rails=3.33 kms & casual renewal of sleepers=3.33 kms. (d)nagpur
Read moreDobeta estimate aug ren of ws scheme including fht connection under jal jeevan mission cat2.
Installation of new transformer of 400 kva capacity at raw water pump house bharri in village bharri distt. hisar and all other works contigenete thereto
Read moreEstimate for aug. and ren. ...
Estimate for aug. and ren. for three nos. villages i.e. nalwa, kanwari, dhamana and three nos.additional bado brahman ,bado rangran and harita raw water arrangement at bncsiwani feeder const. of rcc sump well, rep. of no. pump chamber, repair and
Read moreEstimate for aug. and ren. ...
Construction of rcc sump well, repair of pump chamber, repair of boundary wall, installing of pumping machinery,
Read moreProviding of fht connection...
Dabwali rural - augmentation and renovation of boosting station to village dabwali (covered under water supply scheme village alikan and dabwali) distt. sirsa. (under jjm)
Read moreof your Industry type