Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Weir Adjacent To H.L Bridge Over Girigobardhan Nallah At 3rd K.M On Nh 201 To Kutramunda In The District Of Bolangir For The Year 2022 23
|
| Description |
Construction Of Weir Adjacent To H.L Bridge Over Girigobardhan Nallah At 3rd K.M On Nh 201 To Kutramunda In The District Of Bolangir For The Year 2022 23
|
| Organisation | Government of Odisha |
| Tender Id | 2023_CERWI_98882_6 |
|
Reference Number |
EEPTNG-online-10/2023-24 |
| Tender Fee | 10000 |
| EMD | 60970 |
| Tender Value | |
| Place | O/o the Executive Engineer, R.W.Division,Patnagarh |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | December 28, 2023 16:30 |
| End Date |
Expired
05/01/2024
Expired 910 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreConstruction of non-patchable / missing link roads in compliance of cm budget announcement 2022-23 in jaipur district package no rj-16-50/ml-np/ 2022-23 (risk and cost)
Construction of non-patchable / missing link roads in compliance of cm budget announcement 2022-23 in jaipur district package no rj-16-50/ml-np/ 2022-23 (risk and cost)
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreAnnual maintenance of guest house at tenkasi in tenkasi district for the year 2026 2027
Annual maintenance of guest house at&#x0d tenkasi in tenkasi district for the year&#x0d 2026 2027
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreof your Industry type