Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cleaning And Pitching M And R To Both Earthen Dam And Both Saddle Dam Of Waghur Dam And M And R To Parapet Wall Of Both Saddle Dams Of Waghur Dam And Related Works And M And R To Left And Right Bank Road Side And Allied Works Of Waghur Dam
|
| Description |
Cleaning And Pitching M And R To Both Earthen Dam And Both Saddle Dam Of Waghur Dam And M And R To Parapet Wall Of Both Saddle Dams Of Waghur Dam And Related Works And M And R To Left And Right Bank Road Side And Allied Works Of Waghur Dam
|
| Organisation | CE Tapi Irrigation Development Corporation Jalgaon | State Govt. and UT |
| Tender Id | 2025_TIDC_1199446_1 |
|
Reference Number |
E Tender Notice No 03/14 year 2025-26 |
| Tender Fee | 2860 |
| EMD | 33000 |
| Tender Value | |
| Place | Varadsim Waghur Dam |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2077172 |
| Start Date | July 14, 2025 15:40 |
| End Date |
Expired
21/07/2025
Expired 350 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of toe wall, r...
Construction of toe wall, removing and re- fixing interlocking g.i. wire mesh on toe wall and providing and fixing of new interlocking g.i., wire mesh at missing places including etc and all other works contingent there to in front of sco - 85 to sco
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreReplacement to joinery, plumbing work, sanitary fittings and allied works at poonch under age b/r-ii of ge 881 ews
Replacement to joinery, plumbing work, sanitary fittings and allied works at poonch under age b/r-ii of ge 881 ews
Read moreSpl repair /replacement of asbestos roof sheets and allied works in bldg no e-110 of pine offrs mess under age b/r-iii and age e/m-ii of ge (south) meerut cantt
Spl repair /replacement of asbestos roof sheets and allied works in bldg no e-110 of pine offrs mess under age b/r-iii and age e/m-ii of ge (south) meerut cantt
Read moreRepair to fencing, gates, walls drains, protective work and other allied works in variou units at gulpur, seklu and natu under age b/r-ii of ge 881 ews
Repair to fencing, gates, walls drains, protective work and other allied works in variou units at gulpur, seklu and natu under age b/r-ii of ge 881 ews
Read moreRepair to shed footpath plinth protection and certain b/r works at adm regt ad static aps aad college mh in zone a area and repair/replacement of ht switch gears and maintenance of distribution transformer zone b alongwith allied works under ge(i)gos
Repair to shed footpath plinth protection and certain b/r works at adm regt ad static aps aad college mh in zone a area and repair/replacement of ht switch gears and maintenance of distribution transformer zone b alongwith allied works under ge(i)gos
Read moreCa no.cwe bly/ge (w)/52 of 2026- 2027special repairs to foothpath and allied works from jat annxe to shaheed chowk and krishna road (kr) marge under ge (west) bareilly
Ca no.cwe bly/ge (w)/52 of 2026- 2027special repairs to foothpath and allied works from jat annxe to shaheed chowk and krishna road (kr) marge under ge (west) bareilly
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreCleaning of left and right flank earthen dam and maintenance and repair to pitching of waghur dam maintenance and repairing with colouring left side non over flow section parapet wall of waghur dam m and r to both flank approach road side gutter
Cleaning of left and right flank earthen dam and maintenance and repair to pitching of waghur dam maintenance and repairing with colouring left side non over flow section parapet wall of waghur dam m and r to both flank approach road side gutter
Read moreM and r earthen dam envolope side of stair case concrete work of waghur dam
M and r earthen dam envolope side of stair case concrete work of waghur dam
Read moreof your Industry type