Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Cc Road From Sawar Mal House To Norang Lal Khichi Empty Plot Via Magharam House Ward 52 Fatehpur
|
Description |
Construction Of Cc Road From Sawar Mal House To Norang Lal Khichi Empty Plot Via Magharam House Ward 52 Fatehpur
|
Organisation | Government of Rajasthan |
Tender Id | 2023_DLB_363938_1 |
Reference Number |
npf/23-24/ 7183-7214 |
Tender Fee | 1000 |
EMD | 18000 |
Tender Value | |
Place | Office City Council Fatehpur |
Link | https://eproc.rajasthan.gov.in |
Start Date | September 08, 2023 23:30 |
End Date |
19/09/2023 ( Expired 651 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreConstruction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConstruction of 4 lane concrete white topping nagbhid city portion
Construction of 4 lane concrete white topping (wt) road in nagbhid city portion from 95/000 to 101/235 on nagpur-umred-nagbhir-brahmapuri-armori (nh-353d) in state of maharashtra
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreCc road construction work from vinod prajapati house to khaniyadhana bypass in ward number 14 chief minister infrastructure 4th phase additional approval
Cc road construction work from vinod prajapati house to khaniyadhana bypass in ward number 14 chief minister infrastructure 4th phase additional approval
Read moreConstruction of cc road from dr. sonare to sunil soni house in durga ward betul
Construction of cc road from dr. sonare to sunil soni house in durga ward betul
Read moreConstruction of cc road and rcc drain in different location in malviya ward betul
Construction of cc road and rcc drain in different location in malviya ward betul
Read moreof your Industry type