Tender Details

Particulars Details
Title
Cleaning, Collecton And Loading Of Spilled Coal Along The Belt Conveyors And Crushers Chp Of Padmapur Ocm.Sa
Description
Cleaning, Collecton And Loading Of Spilled&#X0d Coal Along The Belt Conveyors And Crushers Chp Of&#X0d Padmapur Ocm.Sa
Organisation Western Coalfields Limited | Central Govt. Ministry/Department
Tender Id 2024_WCL_741394_1
Reference
Number
Ch3127-enm-0016-2023-24
Tender Fee 0
EMD 2492
Tender Value -
Place Bhatadi OCM, Padmapur Sub AreaPadmapur OCM, Padmap
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1044423

Start Date January 16, 2024 15:30
End Date
Expired 16/01/2024

Expired 1000 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Tggenco-ytps(5x800mw)-supply of bearings with adaptor sleeves required for crusher model of 1219u for crushers of chp/ytps.

Tggenco-ytps(5x800mw)-supply of bearings with adaptor sleeves required for crusher model of 1219u for crushers of chp/ytps.

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana

Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana

Read more
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.

Read more
Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.

Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.

Read more
Cleaning of coal spilled over from trunk belt, gate belt, pony belt conveyors, transfer points and loading point at vishnupuri underground mine no. ii of pench area

Cleaning of coal spilled over from trunk belt, gate belt, pony belt conveyors, transfer points and loading point at vishnupuri underground mine no. ii of pench area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise