Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Making Of Rcc Sump Pit For Accumulation Of Overflow Ash Water Along With Raising Of Floor Of Ash Slurry Ph And Drainage System Revival At Stage I, Ktps
|
| Description |
Making Of Rcc Sump Pit For Accumulation Of Overflow Ash Water&Amp#X0d
Along With Raising Of Floor Of Ash Slurry Ph And Drainage System&Amp#X0d
Revival At Stage I, Ktps
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_863525_1 |
|
Reference Number |
WBPDCL/KTPS/NIT/E3412/25-26 |
| Tender Fee | 0 |
| EMD | 30828 |
| Tender Value | |
| Place | KTPS,Mecheda,Purba Medinipur |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1939319 |
| Start Date | June 18, 2025 16:30 |
| End Date |
Expired
08/07/2025
Expired 370 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Making of rcc sump pit for accumulation of overflow ash water along with raising of floor of ash slurry ph and drainage system revival at stage-i, ktps
Making of rcc sump pit for accumulation of overflow ash water along with raising of floor of ash slurry ph and drainage system revival at stage-i, ktps
Read moreRaising of rcc pedestal for ash slurry pipe line along ash dyke 1 sipat
Raising of rcc pedestal for ash slurry pipe line along ash dyke 1 sipat
Read moreKtps vii stage/paloncha - supply of shaft sleeves for ash water pumps,ash slurry pumps and clinker grinders
Tggenco-ktps vii stage/paloncha - supply of shaft sleeves for ash water pumps,ash slurry pumps and clinker grinders
Read moreRepair and maintenance works to the ash slurry drainage side wall from ash slurry sump stage 2 to bottom ash hopper of unit 3
Repair and&#x0d maintenance works to the ash slurry drainage side wall from ash slurry sump stage 2 to bottom ash hopper of unit 3
Read moreKtps vii stage/paloncha - supply of suction and delivery adaptor for ash slurry pumps
Tggenco-ktps vii stage/paloncha - supply of suction and delivery adaptor for ash slurry pumps
Read moreKtps vii stage/paloncha - supply of 300nb cast basalt spool pieces tee bends for ash slurry disposal lines in wet ash handling system
Tggenco-ktps vii stage/paloncha - supply of 300nb cast basalt spool pieces and tee bends for ash slurry disposal lines in wet ash handling system
Read moreSupply of ash slurry pump suction connecting spool piece suitable for ash slurry pump house of stage i and ii
Supply of ash slurry pump suction connecting spool piece suitable for ash slurry pump house of stage i and ii
Read moreSupply of electrical operated submersible abrasive resistance pump of 250 m3 capacity for ash slurry sump of stage i and ii
Supply of electrical operated submersible abrasive resistance pump of 250 m3 capacity for ash slurry sump of stage i and ii
Read moreConstruction of rcc peripheral drain and rcc sump pit in ash silo stage-iii inside plant area at ntpc rihand
Construction of rcc peripheral drain and rcc sump pit in ash silo stage-iii inside plant area at ntpc rihand
Read moreRoutine prive break down maintenance work of ash slurry disposal pipe lines of stage i to iv and operation of ash water recovery system of stage i to iv at sstps, rvunl, suratgarh
Routine, prive, break down maintenance work of ash slurry disposal pipe lines of stage i to iv and operation of ash water recovery system of stage i to iv at sstps, rvunl, suratgarh
Read moreof your Industry type