Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
(A) Maintenance Of New Double Line Km 2/880 69/260 Under Sse(pw)gpr In Connection With Pa Mrj Section Doubleline Project. (B) Maintenance Of New Double Line Km 69/260 138/200 Under Sse(pw)wtr In Connection With Pa Mrj Section Doubleline Project. (C) Maintenance Of New Double Line Km 138/200 216 Under Sse(pw)krd (Krd)under Sse/Pw/Gpr In Connection With Pa Mrj Section Doubleline Project. (D) Maintenance Of New Double Line Km 216/0 276/130 Under Sse(pw)bvq In Connection With Pa Mrj Section Doubl
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79063668 |
|
Reference Number |
DRM-W-PA-E-Tend-2024-S-32 |
| Tender Fee | 0 |
| EMD | 5.48 Lakh |
| Tender Value | |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79063668/viewNitPdf_4808558.pdf |
| Start Date | January 03, 2025 23:52 |
| End Date |
Expired
27/01/2025
Expired 537 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(a) pune division-tftr under sse(pw)krd under aden/str for 2020-21.(b)provision of track machine siding at msr station under sse(pw)krd section. (c) mrj-kop section trr(p) on bridge 0.74 km & trr(p) 1.00 km =1.74 km in sse(pw)mrj under aden/mrj by 60 kg rails. (d)mrj-kop section- ctr(p) bridge (1-6) approachs work 0.900 km under sse(pw)mrj in aden/mrj. & mrj-kopsec:-ctr (p) bridge (6-36) approaches work 0.900km under sse/pw/mrj in aden/mrj (e) pa-mrj ttr(fstwswcms)-17 (1:12) &
For complete deion and other details, please refer to tender
Read moreBalance work for 2-laning with paved shoulder of sarangarh bypass - saraipalli section of new nh-153 (old nh-216) from km 54.840 to km 84.800 in the state of chhattisgarh on epc basis..
Balance work for 2-laning with paved shoulder of sarangarh bypass - saraipalli section of new nh-153 (old nh-216) from km 54.840 to km 84.800 in the state of chhattisgarh on epc basis..
Read moreBalance work of earthwork, minor bridges, rub, side drain, retaining wall in koregaon to targaon section from km 156/500 to km 176/500 adn side drain, retaining wall, pitching, steps etc. miscellaneous works from satara to miraj section in connection with pune-miraj double line project.
For complete deion and other details, please refer to tender
Read moreNayagaon- biyavra section - mobile flash butt welding of 60 kg. (r-260 / 90 uts) rail from km. 105.00 to km. 164.00 in connection with ramganjmandi - bhopal new bg rail line project in the state of madhya pradesh of kota division of west central railway.
For complete deion and other details, please refer to tender
Read morePsc03 manufacture and supply of pre stressed mono block concrete line sleepers conforming to rdso drg no t 8746 in connection with laying of new bg double railway line for c1 and c23 section of horc project
Manufacture and supply of pre stressed mono block concrete line sleepers conforming to rdso drg no t 8746 in connection with laying of new bg double railway line for c1 and c23 section of horc project
Read moreState plan 2023 24 replacing of old and damaged 100 and 150mm sw sewer line with 200 sw sewer line in kanaka nagar residence area under sewerage section sasthamangalam
State plan 2023 24 replacing of old and damaged 100 and 150mm sw sewer line with 200 sw sewer line in kanaka nagar residence area under sewerage section sasthamangalam
Read moreIn situ reconditioning of cms x-ing by rw-20 translamatic robotic welding of similar under the jurisdiction of sse/p-way/bngn and sse/p-way/glpt in connection with maintenance of bg track, overhauling of lc gates, distressing of track, unloading of ballast on newly constructed bg track along with all other ancillary works between km 17.486 to km 43.00, km 43.00 to km 62.00 & km 62.00 to km 115.00 of newly constructed bg double line in nbq-glpt-kyq project including ayu-jpz-pnvt, pnvt-glpt-
For complete deion and other details, please refer to tender
Read moreUpgradation of shahdol- sagartola section of nh 543 from km 0/000 to km 69/400 to 2 lane with paved shoulders under hybrid annuity mode (ham) in the state of madhya pradesh
Upgradation of shahdol- sagartola section of nh 543 from km 0/000 to km 69/400 to 2 lane with paved shoulders under hybrid annuity mode (ham) in the state of madhya pradesh
Read moreDeposit work of thiruvananthapuram corporation - improving water supply to ambalamukku - kowdiar pipe line road by replacing old ac pipe with new pvc pipe under kowdiar section-providing 90mm pvc pipe in pipe line road along with connection alteratio
Deposit work of thiruvananthapuram corporation - improving water supply to ambalamukku - kowdiar pipe line road by replacing old ac pipe with new pvc pipe under kowdiar section-providing 90mm pvc pipe in pipe line road along with connection alteratio
Read moreErection of new 11 kv line with u/g cable for release nds connection in favour of m/s cairn india ltd village gharaw with maintenance of existing 11 kv line (re-erection of damage points)including testing charges (15 no) under s/d mandore
Erection of new 11 kv line with u/g cable for release nds connection in favour of m/s cairn india ltd village gharaw with maintenance of existing 11 kv line (re-erection of damage points)including testing charges (15 no) under s/d mandore
Read moreof your Industry type