Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bridge At Kukrail River On Lhs Alignment Of Green Corridor In Lucknow (Up) On Epc Basis
|
| Description |
Construction Of Bridge At Kukrail River On Lhs Alignment Of Green Corridor In Lucknow (Up) On Epc Basis
|
| Organisation | Lucknow Development Authority | State Govt. and UT |
| Tender Id | 2024_LDAUP_887408_1 |
|
Reference Number |
100/E-NIVIDA/CE/2023-24 |
| Tender Fee | 59000 |
| EMD | 78.24 Lakh |
| Tender Value | |
| Place | CE LDA |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1525736 |
| Start Date | February 03, 2024 15:30 |
| End Date |
Expired
26/02/2024
Expired 860 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read moreLicensing of kiosk spaces at metro stations of n-s corridor of upmrc network in lucknow.
Licensing of kiosk spaces at metro stations of n-s corridor of upmrc network in lucknow.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreConstruction of corridor gates (2nos) on the access way to the vice-chancellors chamber (re tender).
Construction of corridor gates (2nos) on the access way to the vice-chancellors chamber (re tender).
Read moreInvestigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar panchayat amethi distt lucknow up india
Investigation survey on gis basis and construction of 300 kld and 900 kld stp with 4 kld co &#x0d treatment 19 no leach pit each capacity 10 kld i and d structure and drain work in nagar &#x0d panchayat amethi distt lucknow up india
Read moreRepairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)
Repairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)
Read moreKasargod development package_bakkilapadavu bridge_kasaragod devolopment package_construction of bakilapadavu bridge across shiriya nalka kandige river in kasaragod district_general civil work
Kasargod development package_bakkilapadavu bridge_kasaragod devolopment package_construction of bakilapadavu bridge across shiriya nalka kandige river in kasaragod district_general civil work
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreof your Industry type