Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Service Contract For Fabrication And Erection Of Damaged Underground Fire Water Line By New Over Ground Line At Plant Different Areas Of Bktps.
|
| Description |
Service Contract For Fabrication And Erection Of Damaged Underground Fire Water Line By New Over Ground Line At Plant Different Areas Of Bktps.
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_894638_1 |
|
Reference Number |
WBPDCL/BKTPP/NIT/E3851/25-26 |
| Tender Fee | 0 |
| EMD | 22500 |
| Tender Value | - |
| Place | Bakreswar Thermal Power Plant |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2017566 |
| Start Date | September 11, 2025 14:30 |
| End Date |
Expired
25/09/2025
Expired 383 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of damaged polycarbonate and g.i. sheets over c.h.p. conveyor and parapet walls of different buildings at dvc, btps, bokaro.
Replacement of damaged polycarbonate and g.i. sheets over c.h.p. conveyor and parapet walls of different buildings at dvc, btps, bokaro.
Read moreReplacement of damaged existing borewell motor and erection of additional gi pipe to existing borewells at ward areas in ward no 86, south zone.
Replacement of damaged existing borewell motor and erection of additional gi pipe to existing borewells at ward areas in ward no 86, south zone.
Read moreDesign, engineering, procurement, manufacture, fabrication, supply, transportation, construction, erection, testing commissioning, operations management for 3 years of foot over bridge (fob) at ada office, aligarh
Design, engineering, procurement, manufacture, fabrication, supply, transportation, construction, erection, testing commissioning, operations management for 3 years of foot over bridge (fob) at ada office, aligarh
Read moreTtps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Ttps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit contract for replacement of old corroded i beam structure damaged gi gratings along with supporting members by fabrication erection of new i beam structur..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit contract for replacement of old corroded i beam structure damaged gi gratings along with supporting members by fabrication erection of new i beam structur..
Read moreErection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Erection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Read moreTender for the work of erection of lt underground network for releasing power supply to shri mohan v rivankar at c16 18 a2 1st floor c16 18 a1 upper ground floor c16 18 common c16 18 a4 third floor c16 18 a3 2nd floor behind ram mandir taleigao for a
Tender for the work of erection of lt underground network for releasing power supply to shri mohan v rivankar at c16 18 a2 1st floor c16 18 a1 upper ground floor c16 18 common c16 18 a4 third floor c16 18 a3 2nd floor behind ram mandir taleigao for a
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreProcurement of valves for renovation of damaged underground fire water line by new over ground line at bktps under capex 25 26
Procurement of valves for renovation of damaged underground fire water line by new over ground line at bktps under capex 25 26
Read moreof your Industry type