Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Conducting Impact Assessment Study With Groundwater Modeling By Accredited Groundwater Consultants/Organizations As Per Cgwa Guidelines At Bzduss Ltd., Bhilwara
|
Description |
Conducting Impact Assessment Study With Groundwater Modeling By Accredited Groundwater Consultants/Organizations As Per Cgwa Guidelines At Bzduss Ltd., Bhilwara
|
Organisation | RCDF- MD | State Govt. and UT |
Tender Id | 2024_RCDF_394229_1 |
Reference Number |
BZDUSS/PROJ/E/2024-25/6770-78 |
Tender Fee | 1500 |
EMD | 5000 |
Tender Value | |
Place | BHILWARA |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=706736 |
Start Date | June 19, 2024 18:30 |
End Date |
21/06/2024 ( Expired 377 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, construction of 1 no. 60 ton bp tug as per astds issued by mopsw for shipping operations with s r p system and to supply at vpa
Design, construction of 1 no. 60 ton bp tug as per
 astds issued by mopsw for shipping operations
 with s r p system and to supply at vpa
Read moreEstablishment of mechanized transfer station at jhalana transfer station of nagar nigam jaipur greater by installing static compactors with all required machineries as per tender specifications and conditions and operation and maintenance of
Establishment of mechanized transfer station at jhalana transfer station of nagar nigam jaipur greater by installing static compactors with all required machineries as per tender specifications and conditions and operation and maintenance of
Read moreCarrying out various piping work as per standard specification by providing all required materials on sub-contract basis in connection with composite work for units avu unit (part a) for panipat refinery expansion project (p25) of m/s iocl at panipat
Carrying out various piping work as per standard specification by providing all required materials on sub-contract basis in connection with composite work for units avu unit (part a) for panipat refinery expansion project (p25) of m/s iocl at panipat
Read moreFiber sel motor boat operation and maintenance along with operator, helper and flood rescue material as per requirement at rent rate. diesel and oil will be provided by the department as per requirement
Fiber sel motor boat operation and maintenance along with operator, helper and flood rescue material as per requirement at rent rate. diesel and oil will be provided by the department as per requirement
Read moreInspection vehicle bolero or equivalent vehicle with driver at rent rate as per requirement fuel provided by the department
Inspection vehicle bolero or equivalent vehicle with driver at rent rate as per requirement fuel provided by the department
Read moreCarrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Carrying out various instrumentation works for part b as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Read moreSupplying,fitting,fixing of office table make with ply and sunmica in various size as per drawings as directed by eic at daulatnagar gram panchayat office
Supplying,fitting,fixing of office table make with ply and sunmica in various size as per drawings as directed by eic at daulatnagar gram panchayat office
Read moreVgtps - phase - i and ii - pat - monitoring and verification energy audit for pat cycle- vii (2022-2025) as per energy conservation act 2001 by approved empanelled accredited energy audited firms at vgtps.
Vgtps - phase - i and ii - pat - monitoring and verification energy audit for pat cycle- vii (2022-2025) as per energy conservation act 2001 by approved empanelled accredited energy audited firms at vgtps.
Read moreCarrying out various instrumentation worksfor part a as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Carrying out various instrumentation worksfor part a as per standard specification by providing all required materials in connection with the composite works for setting up of hpg-2, butene-1 and psa units at lepetkata, assam of m/s bcpl
Read moreRenovation and modification of electrical installations and providing additional lan points with allied works as per requirement by user in room no 109 southern lab in academic area in the campus at iit kanpur
Renovation and modification of electrical installations and providing additional lan points with allied works as per requirement by user in room no 109 southern lab in academic area in the campus at iit kanpur
Read moreof your Industry type