Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair Maintenance Of Belt Conveyors Of Boiler Section During Off Season, 2025
|
| Description |
Repair Maintenance Of Belt Conveyors Of Boiler Section During Off Season, 2025
|
| Organisation | Haryana Board Corporation | State Govt. and UT |
| Tender Id | 2025_HBC_457773_1 |
|
Reference Number |
Repair maintenance of Belt Conveyors of Boiler section during off-season, 2025 |
| Tender Fee | 1280 |
| EMD | 22200 |
| Tender Value | - |
| Place | The Shahabad Cooperative Sugar Mills Ltd |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=535483 |
| Start Date | July 11, 2025 16:30 |
| End Date |
Expired
23/07/2025
Expired 445 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana
Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreBmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27
Bmd-availing the services to carry out various non-destructive examinations (nde) in 1x500mw boiler during upcoming capital overhauls 2026-27
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreBmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Bmd-service charges towards deputation of service engineers for supervising the overhauling works of boiler burners, safety valves, hangers and soot blowing system of 1x 500mw boiler during coh works for the year 2026-27
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreof your Industry type