Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Spares For Cooling Towers Level Measurement
|
| Description |
Procurement Of Spares For Cooling Towers Level
Measurement
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NTECL_158191_2 |
|
Reference Number |
100000655 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | NTECL Vallur |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | July 17, 2023 22:35 |
| End Date |
Expired
24/07/2023
Expired 1183 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Submersible slurry pump for cooling towers desilting
Submersible slurry pump for cooling towers desilting
Read moreRprc264395- repair and maintenance of various cooling towers at iocl panipat refinery
Rprc264395- repair and maintenance of various cooling towers at iocl panipat refinery
Read moreService for chemical treatment of cooling water - cooling towers induced draft cooling tower (idct) chemical dosing plan, periodic testing of cooling water parameters, installation/maintenance of dosing systems (if applicable), adjustment of treatm..
Service for chemical treatment of cooling water - cooling towers induced draft cooling tower (idct) chemical dosing plan, periodic testing of cooling water parameters, installation/maintenance of dosing systems (if applicable), adjustment of treatm..
Read moreRepair/ maint of ahus/ cooling towers and other connected works at air force station jaisalmer
Repair/ maint of ahus/ cooling towers and other connected works at air force station jaisalmer
Read moreSupply, installation, testing and commissioning of partial-flow measurement system (ultrasonic cross-correlation multi-level velocity, level measurement and 3d pipe modelling) for vertical / horizontal-drop sewer pipelines of 450 mm, 700 mm and 1000
Supply, installation, testing and commissioning of partial-flow measurement system (ultrasonic cross-correlation multi-level velocity, level measurement and 3d pipe modelling) for vertical / horizontal-drop sewer pipelines of 450 mm, 700 mm and 1000
Read moreNutch filter,instrumentation work bench,sensor trainer kit,show piece for radar type level indicator,solid level measurement using ultrasonic level detector, microwave level detector, capacitance probe level detector, point type level detector.,universal calibrator,smart transmitter for pressure, temperature, flow and level
Nutch filter,instrumentation work bench,sensor trainer kit,show piece for radar type level indicator,solid level measurement using ultrasonic level detector, microwave level detector, capacitance probe level detector, point type level detector.,universal calibrator,smart transmitter for pressure, temperature, flow and level
Read moreCritical spares for environmental cooling temperature test chamber oft no. 3658. annexure enclosed.
Critical spares for environmental cooling temperature test chamber oft no. 3658. annexure enclosed.
Read more9030c26e11 refurbishment of cooling towers for hvac of south block north block s stn38 gre and lab control room in gujarat refinery.
9030c26e11 refurbishment of cooling towers for hvac of south block north block s stn38 gre and lab control room in gujarat refinery.
Read moreof your Industry type