Tender Details
Particulars | Details |
---|---|
Title |
Multicore Cable With 12 Takeout And 10 Meters Spacing Of Existing Syscal R1 Plus, Switch 48 Ert System
|
Description |
Multicore Cable With 12 Takeout And 10 Meters Spacing Of Existing Syscal R1 Plus, Switch 48 Ert System
|
Organisation | Indian Institute of Technology(ISM) Dhanbad | Central Govt. Ministry/Department |
Tender Id | 2025_ISMD_847998_1 |
Reference Number |
GP-INS-CPPP-213-24-25 |
Tender Fee | 0 |
EMD | 12500 |
Tender Value | |
Place | IIT(ISM) Dhanbad |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=891451 |
Start Date | February 15, 2025 23:30 |
End Date |
09/03/2025 ( Expired 94 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp
Supply, installation and commissioning of lhs cable along with accessories and integration with existing fire alarm system for chp conveyor belt area under capex 2024-25.&#x0d
Read moreDesign finance supply installation and commissioning of 500 mtpd 10 percent semi automatic modular compact facility integrated system composting mrf for processing and disposal of solid waste at bhandewadi nagpur along with its o and m for 5years
Design finance supply installation and commissioning of 500 mtpd 10 percent semi automatic modular compact facility integrated system composting mrf for processing and disposal of solid waste at bhandewadi nagpur along with its o and m for 5years
Read moreRepair replacement and maintenance of ht switch gears, ht distribution system, 2/4 pole structure earthings ht cable and transformers at trisul line, chq, signal centre, 3tb under 1eme centre area and repair replacement maintenance of ht switch ge
Repair replacement and maintenance of ht switch gears, ht distribution system, 2 4 pole structure earthings ht cable and transformers at trisul line, chq, signal centre, 3tb under 1eme centre area and repair replacement maintenance of ht switch ge
Read moreRepairs replacement nd maintenance gang operated switch 2 4 pole structure ht cable transformers, calibration of vcbs equipment and body earthing and ht switch gears, ht distributions system, earthings at bowenpally area under age em-i area of g
Repairs replacement maintenance gang operated switch 2 4 pole structure ht cable transformers, calibration of vcb s equipment and body earthing and ht switch gears, ht distributions system, earthings at bowenpally area under age em-i area of g
Read moreSitc of 9.5tr pac system along with associated electrical works of data center and dismantling of the existing old pac units with buy back option at academic block-a, iit hyderabad
Sitc of 9.5 tr precision air-conditioning (pac) system along with associated electrical works of data center and dismantling of the existing old pac units with buy back option at ground floor, chemical engineering (a) block, iit hyderabad
Read moreSpl repair for replacement of existing chlorination system with v 100 hydro dis system in swimming pool no 1 and connected works in dinjan mil stn under ge dinjan
Spl repair for replacement of existing chlorination system with v 100 hydro dis system in swimming pool no 1 and connected works in dinjan mil stn under ge dinjan
Read moreShifting, di, extension of pipeline arrangement for lower kusmunda-1 (lk-1) and lower kusmunda-2 (lk-2) quarry sumps by laying and jointing of pipeline for dewatering purposes along with making of bends of sizes 12/10/8/6/4 inches at dep.
Shifting, di, extension of pipeline arrangement for lower kusmunda-1 (lk-1) and lower kusmunda-2 (lk-2) quarry sumps by laying and jointing of pipeline for dewatering purposes along with making of bends of sizes 12/10/8/6/4 inches at dep.
Read moreDesign, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Design, engineering, supply, installation, testing and commissioning of 250mw / 500mwh battery energy storage system (bess) project with 12 years of comprehensive operation and maintenance at maithon, jharkhand, india
Read moreUpgradation of existing pa system with new pa system to sri kalyana venkateswaraswamy temple, srinivasamangapuram and sri venkateswarswamy temple, srivarimettu
Upgradation of existing pa system with new pa system to sri kalyana venkateswaraswamy temple, srinivasamangapuram and sri venkateswarswamy temple, srivarimettu
Read moreComplete supply as per annexure c bom, installation including material , testing and commissioning of 137 cctv cameras and connecting with existing surveillance security system erecting new surveillance system if needed in project residential colon
Complete supply as per annexure c bom, installation including material , testing and commissioning of 137 cctv cameras and connecting with existing surveillance security system erecting new surveillance system if needed in project residential colon
Read moreof your Industry type