Tender Details
Particulars | Details |
---|---|
Title |
Preparation Of Plans, Form 1, Questionnaire, Certificates Of Stability And Other Documents And Mah Compliances Etc., Arranging The Approval From Directorate Of Factories After Removing All The Objections
|
Description |
Preparation Of Plans, Form 1, Questionnaire, Certificates Of Stability And Other Documents An Mah Compliances Etc., Arranging The Approval From Directorate Of Factories After Removing All The Objections For 2 X660 Mw, Ctps, Obra Thermal Power Project,
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2025_RVUNL_996469_1 |
Reference Number |
02/CACD/CTPS/2024-25 |
Tender Fee | 1180 |
EMD | 20000 |
Tender Value | |
Place | CTPS, OBRA |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1766888 |
Start Date | January 22, 2025 19:30 |
End Date |
06/02/2025 ( Expired 97 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
01/ptep/emcc-ii/emcd-vi/25-26
Preparation of plans, form-1, questionnaire, certificates of stability and other documents an mah compliances etc., arranging the approval from directorate of factories after removing all the objections 1x660 mw panki thermal extension project.
Read more1 nos. of repair and service of previously purchased road sweeping machine etc. within the warranty period of two years for all parts and engine. apart from this, it will be mandatory to replace other essential parts also if they are defective.
1 nos. of repair and service of previously purchased road sweeping machine etc. within the warranty period of two years for all parts and engine. apart from this, it will be mandatory to replace other essential parts also if they are defective.
Read morePreparation of plans, form-1, questionnaire, certificates of stability and other documents and mah compliances etc., arranging the approval from directorate of factories after removing all the objections
Preparation of plans, form-1, questionnaire, certificates of stability and other documents an mah compliances etc., arranging the approval from directorate of factories after removing all the objections for 2x660 mw, ctps, obra thermal power project,
Read morePreparation of plans, form-1, questionnaire, certificates of stability and other documents, mah compliances etc., arranging the approval from directorate of factories after removing all the objections for 2x660 mw, ctps, obra thermal power project,
Preparation of plans, form-1, questionnaire, certificates of stability and other documents , mah compliances etc., arranging the approval from directorate of factories after removing all the objections for 2x660 mw, ctps, obra thermal power project,
Read moreGhmc - consultancy serivices for preparation of detailed project report for 1) capacity enhancement and operational measures at identified lakes in ghmc by providing sluice gates, de-silting, bund formation, ring main etc for effective flood retention and regulation of tanks and 2). creation of sponge zones : preamble pavements that enables percolation which minimize surface runoff in ghmc area includiing obtaining approval from concerned authorities and goi
Ghmc- consultancy service for preparation of detailed project for 1). capacity enhancement and operational measures at identified lakes in ghmc by providing sluice gates, de-silting, bund formation, ring main etc for effective flood retention and requlation of tanks and 2). creation of sponge zones : preamble pavements that enables percolation which minimize surface runoff in ghmc area including obtaining approval from concerned authorities and goi
Read moreAt kalinarayanpur- santipur section : provision of standard height gauge as per rdso at lc gate no- 59/1, 59/2,59/3, 59/4, , 59/5, 59/6, 59/8, 60b/e, 61c/t with all ancillary works under sse/works/ranaghat and kalinarayanpur- krishnanagar section : provision of standard height gauge as per rdso at lc gate no- 60, 61, 62, 62a, 63, 64, 65, 67 with all ancillary works under sse/works/krishnanagar (total-17) in the juridction of aen/ranaghat.
For complete deion and other details, please refer to tender
Read moreRenovation and refurbishing of all rooms,toilet raising 192.0 meter boundary wall construction entrance gate,play ground,waterproofing electrification ,trusses for cycle stand etc epes govt.hs nomohala.gwalior.file no.182/22x3/3
Renovation and refurbishing of all rooms,toilet raising 192.0 meter boundary wall construction entrance gate,play ground,waterproofing electrification ,trusses for cycle stand etc epes govt.hs nomohala.gwalior.file no.182/22x3/3
Read moreConstruction of 3 (three) units additional class room and 1(one) unit computer room at pm shri rajnagar high school, matabari block,gomati district under pm shri scheme
Construction of 3 (three) units additional class room and 1(one) unit computer room at pm shri rajnagar high school, matabari block,gomati district under pm shri scheme
Read moreConducting final location survey, including collection of field details for geotechnical investigation, preparation of gads & other drawings and preparation of survey report & estimate etc for the work of (i) flyover between uslapur - dadhapara (17.875 km) (ii) flyover anuppur(9.20 km), (iii) 3rd & 4th line between champa-gevra road (92 km) & (iv) new double line connecting tallaipalli mines & gare pelma mines along with y form connectivity with gharghoda - bhalumuda line &
For complete deion and other details, please refer to tender
Read moreGeneral housekeeping cleaning and reclamation of spilled coal etc from all locations of coal handling plant as per scope of work on stage 1 and 2 at 2x210 mw 2x250 mw ghtp lehra mohabat
General housekeeping cleaning and reclamation of spilled coal etc from all locations of coal handling plant as per scope of work on stage 1 and 2 at 2x210 mw 2x250 mw ghtp lehra mohabat
Read moreof your Industry type