Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Sukhand To Kutroli Via Bahera Road Construction Project 🛣️ The Public Works Department (Roads And Bridges), State Govt. And Ut, Is Seeking Bids From Experienced Contractors For The Construction Of A Road Stretch From Sukhand To Kutroli Via Bahera, Mehgaon, Spanning A Total Length Of 7.00 Km. 📅 Bid Submission Deadline: April 20, 2024, 5:30 Pm Interested Bidders Must Submit A Tender Fee Of Inr 21534 And An Earnest Money Deposit (Emd) Of Inr 656230. Detailed Project Plans, Financial Bids, And Technical Proposals Are To Be Included In The Submission. Keywords: Construction Work, Road Project, Pwd, State Govt. And Ut, Infrastructure Development, Tender, Bid, Emd, Sukhand To Kutroli Via Bahera Road, Mehgaon| Particulars | Details |
|---|---|
| Title |
Construction Work On Sukhand To Kutroli Via Bahera Road Under Sub Dn. Mehgaon Length 7.00 Km
|
| Description |
Construction Work On Sukhand To Kutroli Via Bahera Road&Amp#X0d
Under Sub Dn. Mehgaon Length 7.00 Km
|
| Organisation | PWD- Roads and Bridges | State Govt. and UT |
| Tender Id | 2024_PWDRB_341771_1 |
|
Reference Number |
16(8)/SAC/2023-24/BHIND |
| Tender Fee | 21534 |
| EMD | 6.56 Lakh |
| Tender Value | - |
| Place | OFFICE OF THE EXECUTIVE ENGINEER PWD DIV. BHIND |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=401744 |
| Start Date | March 06, 2024 23:00 |
| End Date |
Expired
20/04/2024
Expired 863 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance of the road kallambella to hosamallenahalli via maralappanahalli from ch 0.00-2.70km, 3.00-4.00, & 7.00-15.00km for the year 2026-27(total length 15.00km from ch-0.00-15.00, over lap 0.60km)
Annual maintenance of the road kallambella to hosamallenahalli via maralappanahalli from ch 0.00-2.70km, 3.00-4.00, & 7.00-15.00km for the year 2026-27(total length 15.00km from ch-0.00-15.00, over lap 0.60km)
Read moreMaintenance of road from hosalli (h) (on sh192) connecting raikod (on sh149) via halchera, tegaltippi, gadikeshwar mdr04091 from 4.00 km to 6.00 km, 7.00 km to 12.92 kmn kalagi taluka.under 3054 mdr maintenance for the year 2026-27.
Maintenance of road from hosalli (h) (on sh192) connecting raikod (on sh149) via halchera, tegaltippi, gadikeshwar mdr04091 from 4.00 km to 6.00 km, 7.00 km to 12.92 kmn kalagi taluka.under 3054 mdr maintenance for the year 2026-27.
Read moreWidening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Widening and strengthening, reconstruction work of rani road, rob barmasiya to kusumatand (mukunda) more via jhariya vihar colony belgariya road (length-7.612 km) in dhanbad district on deposit basis
Read moreTender for strengthening of 66kv dg-4 by replacing existing coyote conductor by hpc conductor of ampacity 700a from geddalahalli cable tapping tower till 66/11kv hennur cable tapping tower in tlm sub-division, hoody for a length of 230 mtrs & 02 spans in bengaluru south taluk, bengaluru urban district on total turnkey on percentage basis
Tender for strengthening of 66kv dg-4 by replacing existing coyote conductor by hpc conductor of ampacity 700a from geddalahalli cable tapping tower till 66/11kv hennur cable tapping tower in tlm sub-division, hoody for a length of 230 mtrs & 02 spans in bengaluru south taluk, bengaluru urban district on total turnkey on percentage basis
Read moreConstruction work on sukhand to kutroli via bahera road under sub dn. mehgaon length 7.00 km
Construction work on sukhand to kutroli via bahera road under sub dn. mehgaon length 7.00 km
Read moreConstruction work on sukhand to kutroli via bahera road under sub dn. mehgaon length 7.00 km (including pole shifting)
Construction work on sukhand to kutroli via&#x0d bahera road under sub dn. mehgaon length 7.00 km (including pole shifting)
Read moreConstruction work on sukhand to kutroli via bahera road under sub dn. mehgaon length 7.00 km (including pole shifting)
Construction work on sukhand to kutroli via&#x0d bahera road under sub dn. mehgaon length 7.00km (including pole shifting)
Read moreConstruction work on sukhand to kutroli via bahera road under sub dn. mehgaon length 7.00 km (including pole shifting)
Construction work on sukhand to kutroli via&#x0d bahera road under sub dn. mehgaon length 7.00&#x0d km (including pole shifting)
Read moreConstruction work on sukhand to kutroli via bahera road under sub dn. mehgaon length 7.00 km (including pole shifting)
Construction work on sukhand to kutroli via&#x0d bahera road under sub dn. mehgaon length 7.00&#x0d km (including pole shifting)
Read moreConstruction of mau mehgaon road to (nh-719) gwalior etawah road via upjail mehgaon baypass under sub dn mehgaon. length 7.00 k.m.
Construction of mau mehgaon road to (nh-719) gwalior etawah road via upjail mehgaon baypass&#x0d under sub dn mehgaon. length 7.00 k.m.
Read moreof your Industry type