Tender Details
Particulars | Details |
---|---|
Title |
Re Carpeting Of Coal Transportation Road Chp To 56 Dafai Tri Junction At West Jkd Mine Under Jkd Sub Area.
|
Description |
Re Carpeting Of Coal Transportation Road Chp To 56 Dafai Tri Junction At West Jkd Mine Under Jkd Sub Area.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_332714_1 |
Reference Number |
GM/HSD/C/e-Tender/24-25/153 Date 17.03.2025 |
Tender Fee | 0 |
EMD | 63700 |
Tender Value | |
Place | JKD Sub Area, Distt.-M-C-B(C.G.) |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344902 |
Start Date | March 19, 2025 15:30 |
End Date |
03/04/2025 ( Expired 67 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreRepair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar
Repair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar
Read moreLife enhancement of various super structures at chp area of ktps under capex 2025 26
Life enhancement of various super structures at chp area of ktps under capex 2025 26
Read moreConstruction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block
Construction of cement concrete road from subhadra store to ashram at tehatta under tehatta g.p. under tehatta-i development block
Read moreConstruction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Construction of r.c.c. wall at green belt area from robot square to khajrana square (both side) service road under garden civil department (h.q.).
Read moreFour laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana
Four laning from budhel junction to vartej y junction (km 0.900 to km 9.400) at bhavnagar bypass in the state of gujarat on epc mode under bharatmala pariyojana
Read more81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
81795 provn of external electric supply to d-1 offrs md accn area and provision of recd (retrofitting emission control device) for all dg sets at nda under ge (nda) khadakwasla
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type