Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
๐ Procurement Bid: Established Pole Meter And Lttvm Box For Bulandshahr Divisions ๐ณ๐ Paschimanchal Vidyut Vitran Nigam Ltd., A State Government Undertaking, Is Seeking Bids For The Supply And Installation Of Established Pole Meters And Lttvm (Low Tap Voltage Meter) Boxes In The Divisions Under Etd Iii In Bulandshahr. ๐ Bid Submission Deadline: 31/05/2024, 11:00 Am Tender Fee: Inr 1180 Emd: Inr 2000 Interested Bidders Should Have Prior Experience In Similar Projects And Must Submit Detailed Bids, Including Technical Specifications, Pricing, And Installation Timelines. Keywords: Pole Meter, Lttvm Box, Paschimanchal Vidyut Vitran Nigam Ltd, Bulandshahr, Government Tender, Electrical Equipment, Tender Fee, EmdParticulars | Details |
---|---|
Title |
Established Pole Meter And Lttvm Box In The Area Of Divisions Under Etd Iii Bulandshahr.
|
Description |
Established Pole Meter And Lttvm Box In The Area Of Divisions Under Etd Iii Bulandshahr.
|
Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2024_PVVNL_925468_1 |
Reference Number |
02/EDC-III/B/2024-2025 |
Tender Fee | 1180 |
EMD | 2000 |
Tender Value | |
Place | BULANDSHAHR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1598545 |
Start Date | May 25, 2024 23:30 |
End Date |
02/07/2024 ( Expired 354 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLoss reduction works under rdss in ut of andaman and nicobar islands
Loss reduction works under rdss in ut of andaman and nicobar islands
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreWork of providing and fixing of 2x400 watt high mast light fitting and 2x100 watt aviation light for lighting arrangement at 220 kv s/s katrari, deoria under etd, deoria
Work of providing and fixing of 2x400 watt high mast light fitting and 2x100 watt aviation light for lighting arrangement at 220 kv s/s katrari, deoria under etd, deoria
Read moreof your Industry type