Tender Details

Particulars Details
Title
Replacement After Machining Of New Drum Shaft After Dismantling And Refitting Of All The Mechanical Components With Proper Alignment And
Description
Replacement After Machining Of New Drum Shaft After Dismantling And Refitting Of All The Mechanical Components With Proper Alignment And&#X0d Replacement Of Drum Shaft Bearings Of Elecon Make Feeder Breaker Of Giridih Project&#X0d
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_328368_1
Reference
Number
SO(EnM)/GRD/E-NIT/24-25/39 DT 08.02.2025
Tender Fee 0
EMD 7000
Tender Value
Place Giridih Project
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=340372
Start Date February 09, 2025 14:30
End Date

19/02/2025 ( Expired 62 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Replacement of old pole and mh fittings with new pole and led fittings at main yard mukeriyan and sub yard bhangala market committee mukeriyan and distt hoshiarpur

Replacement of old pole and mh fittings with new pole and led fittings at main yard mukeriyan and sub yard bhangala market committee mukeriyan and distt hoshiarpur

Read more
Complete maintenance along with painting and replacement of all rubber seals of intake gate of machine no. 01, 02 and 03 of sheetla power house, moth, jhansi

Complete maintenance along with painting and replacement of all rubber seals of intake gate of machine no. 01, 02 and 03 of sheetla power house, moth, jhansi

Read more
Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur

Sitc of new control cum protection panel for hv side of 66 by 11kv 2mva transformers no. 01 and 02 along with dismantling of existing old panel at matatila hydro power plant distt lalitpur

Read more
Fabrication and replacement of primary and secondary superheater tubes with new of service boiler of cpp.

Fabrication and replacement of primary and secondary superheater tubes with new of service boiler of cpp.

Read more
Attending day to day petty repair works, misc b/r works and replacement of old type u/s tube light fittings with new type energy efficient led light fittings in ms unit and air wing area at arc doom dooma under ge (af) chabua

Attending day to day petty repair works, misc b/r works and replacement of old type u/s tube light fittings with new type energy efficient led light fittings in ms unit and air wing area at arc doom dooma under ge (af) chabua

Read more
Installation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, dismantling of ms pipes and other miscellaneous work for the purpose of dewatering, firefighting as per requirement.

Installation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, dismantling of ms pipes and other miscellaneous work for the purpose of dewatering, firefighting as per requirement.

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at new budha zone-29 asansol under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at new budha zone-29 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Dismantling of old rusted and wornout gate parts, manufacturing, erection, and testing of lbc outlet new sliding type gate of size 0.9 x 0.9 mtr. with gate leaf at chor jawla m.i. tank, tal. and dist. hingoli

Dismantling of old rusted and wornout gate parts, manufacturing, erection, and testing of lbc outlet new sliding type gate of size 0.9 x 0.9 mtr. with gate leaf at chor jawla m.i. tank, tal. and dist. hingoli

Read more
Providing and fixing of micro-processor based zero/under-speed switches along with all the allied works including incorporation of these switches in the plc arrangement of conveyors of new chp and silo of secl, dipka expansion project

Providing and fixing of micro-processor based zero/under-speed switches along with all the allied works including incorporation of these switches in the plc arrangement of conveyors of new chp and silo of secl, dipka expansion project

Read more
Replacement of cgi sheet roofing above new block, old block and conference hall building with roofing shingles land mark pro max def (colour oak red) at hotel holiday home shimla h.p

Replacement of cgi sheet roofing above new block, old block and conference hall building with roofing shingles land mark pro max def (colour oak red) at hotel holiday home shimla h.p

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise