Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Imp. Of Lane From Gh.Nabi Dar To Ho Shafat Ah .Parwaz At Jawaharpora.
|
| Description |
Imp. Of Lane From Gh.Nabi Dar To Ho Shafat Ah .Parwaz At Jawaharpora.
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_225321_39 |
|
Reference Number |
e- NIT No. 87/2023-24 Dated 07-08-2023 |
| Tender Fee | 200 |
| EMD | 2000 |
| Tender Value | |
| Place | Executive Engineer REW Division Pulwama |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | August 07, 2023 23:30 |
| End Date |
Expired
17/08/2023
Expired 1061 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of cc road from rahat wali ghati to charbhuja ji temple at revenue village dhikali. 2603
Construction of cc road from rahat wali ghati to charbhuja ji temple at revenue village dhikali. 2603
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreIe services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreEngagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreMaintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based
 maintenance contract in the state of uttar pradesh.
Read moreProviding essential service for the period from 16.07.2026 to 31.03.2027 for the annual maintenance of evr periyar building nandanam chennai
Providing essential service for the period from 16.07.2026 to 31.03.2027 for the annual maintenance of evr periyar building nandanam chennai
Read moreof your Industry type