Tender Details

Particulars Details
Title
Renovation Of Jirania Sub Division Office Sub Divisional Level Water Testing Labratory During The Year 2024 25 / S.H Brick Work, Rcc Work, Roofing, Finishing Work Etc Complete.
Description
Please Refer To Dn Ie T
Organisation Chief Engineer, PWD (DWS) | State Govt. and UT
Tender Id 2025_CEDWS_58291_1
Reference
Number
105/DNIeT/EE/DWS/JRN/2024-25
Tender Fee 1000
EMD 19337
Tender Value -
Place RANIRBAZAR
Link
View Original Tender Notice

https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=59274

Start Date February 12, 2025 23:30
End Date
Expired 27/02/2025

Expired 596 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work

Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Steel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa

Steel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa

Read more
Reconstruction of half brick wall i/c providing cgi sheet roofing demolished during fire incident in divisional store at vaidehinagar distt ayodhya

Reconstruction of half&#x0d brick wall including providing cgi sheet roofing demolished during fire incident in divisional store at vaidehinagar distt ayodhya

Read more
Diversion scheme at pickraicharra under durgachowmuhani block during the year 2023 24 s.h repairing of brick line canal.

Diversion scheme at pickraicharra under durgachowmuhani block during the year 2023 24 s.h repairing of brick line canal.

Read more
Hpli scheme at halahali gp under durgachowmuhani block during the year 2023 24 s.h repairing of brick line canal.

Hpli scheme at halahali gp under durgachowmuhani block during the year 2023 24 s.h repairing of brick line canal.

Read more
Mtc. of karbook inspection banglow. during the year 2023 - 24 s.h.- wood work, flooring, roofing, painting, sanitary instralation and water supply

Mtc. of karbook inspection banglow. during the year 2023 - 24 s.h.- wood work, flooring, roofing, painting, sanitary instralation and water supply

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise