Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Of Jirania Sub Division Office Sub Divisional Level Water Testing Labratory During The Year 2024 25 / S.H Brick Work, Rcc Work, Roofing, Finishing Work Etc Complete.
|
| Description |
Please Refer To Dn Ie T
|
| Organisation | Chief Engineer, PWD (DWS) | State Govt. and UT |
| Tender Id | 2025_CEDWS_58291_1 |
|
Reference Number |
105/DNIeT/EE/DWS/JRN/2024-25 |
| Tender Fee | 1000 |
| EMD | 19337 |
| Tender Value | - |
| Place | RANIRBAZAR |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=59274 |
| Start Date | February 12, 2025 23:30 |
| End Date |
Expired
27/02/2025
Expired 596 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreSteel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Steel reinforcement for r.c.c. work including straightening cutting bending placing in position and binding all complete above plinth level thermo mechanically treated bars of grade fe500d or more.,half brick masonry with common burnt clay fps non modular bricks of class designation above plinth level up to floor v level cement mortar 1 is to 4 where 1 cement and 4 coarse sand,stainless steel cramps,two track two panels sliding with aluminium channel for roller track wool pile nylon rollers with ss 304 using r4 series with frame,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,providing and fixing 2mm thick 16 to 19mm wide pvc edge binding tape of approved quality for cupboard,double charge vitrified tile polished finish of size of tile 600 x 600 mm,finishing walls with premium acrylic smooth exterior paint with silicone additives of required shade,providing and applying white cement based putty of average thickness 1 mm,wiring for light point fa
Read moreRenovation of mini swtp store room under jnp under pwd (dws) sub division jirania during the year 2024- 25 / s.h brick work, sanitary work, finishing work etc complete
Please refer to dniet
Read moreReconstruction of half brick wall i/c providing cgi sheet roofing demolished during fire incident in divisional store at vaidehinagar distt ayodhya
Reconstruction of half
 brick wall including providing cgi sheet roofing demolished during fire incident in divisional store at vaidehinagar distt ayodhya
Read moreDiversion scheme at pickraicharra under durgachowmuhani block during the year 2023 24 s.h repairing of brick line canal.
Diversion scheme at pickraicharra under durgachowmuhani block during the year 2023 24 s.h repairing of brick line canal.
Read moreJjm scheme work under jirania r.d. block s.h extention of pipeline at various locations along with fhtc and other allied works within the jurisdiction of dws sub-division, jirania during 2024-25
Please refer to dniet
Read moreHpli scheme at halahali gp under durgachowmuhani block during the year 2023 24 s.h repairing of brick line canal.
Hpli scheme at halahali gp under durgachowmuhani block during the year 2023 24 s.h repairing of brick line canal.
Read moreMtc. of karbook inspection banglow. during the year 2023 - 24 s.h.- wood work, flooring, roofing, painting, sanitary instralation and water supply
Mtc. of karbook inspection banglow. during the year 2023 - 24 s.h.- wood work, flooring, roofing, painting, sanitary instralation and water supply
Read moreof your Industry type