Tender Details
About Tender
🔧 Invitation For Bids: Simpson Make Welding Machine Repair 🏭🔧 Mahanadi Coalfields Limited (Mcl), A Public Sector Undertaking, Is Seeking Bids For The Repair Of A Simpson Make Welding Machine (415 V, 3 Phase) Installed In The Service Van Of The Field Section Workshop At The Integrated L B L Ocp, Lakhanpur Area. 📅 Bid Submission Deadline: July 15, 2024, 5:00 Pm The Tender Fee Is Inr 400. Interested Vendors Must Submit Detailed Technical And Financial Bids, Including Their Expertise In Repairing Similar Equipment, To Be Considered For This Project. Keywords: Repair Services, Welding Machine, Simpson Make, 415 V, 3 Phase, Mahanadi Coalfields Limited, Public Sector Undertaking, Tender, Bid Submission, Lakhanpur Area, Ilbl OcpParticulars | Details |
---|---|
Title |
Repairing Of Simpson Make Welding Machine (415 V,3 Phase,) Fitted In Service Van Of Field Section Workshop At Integrated L B L Ocp
|
Description |
Repairing Of Simpson Make Welding Machine (415 V,3 Phase,) Fitted In Service Van Of Field Section Workshop At Integrated L B L Ocp
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_MCL_311712_1 |
Reference Number |
MCL/LKPA/ILBL/ePC-EX/24-25/04 |
Tender Fee | 0 |
EMD | 400 |
Tender Value | |
Place | Excavation W-shop, ILBL OCP, Lakhanpur Area, MCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323113 |
Start Date | July 03, 2024 20:30 |
End Date |
15/07/2024 ( Expired 306 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Comprehensive maintenance for 1 no. johnson make 10 passenger g plus 2 lift in directorate of animal husbandry and veterinary services at haddo, sri vijaya puram under section ii of sd ii, workshop division, apwd during the year 2024-2027
Comprehensive maintenance for 1 no. johnson make 10 passenger g plus 2 lift in directorate of animal husbandry and veterinary services at haddo, sri vijaya puram under section ii of sd ii, workshop division, apwd during the year 2024-2027
Read moreRepairing of 10 nos. alternator assy. 24 v.75amps.100 amps. delco remy make alternator installed in hemm like dumpers, dozers, grader and drills at kdh project.
Repairing of 10 nos. alternator assy. 24 v.75amps.100 amps.delco remy make alternator installed in hemm like dumpers,
 dozers, grader and drills
 at kdh project.
Read more(1) repairing of (a). 325kw, 3.3kv dol er si. no. sa-1619 of gvp phase-ii ocp (b). 240kw, 3.3kv dol er si. no. sa-1617 of rkb pump of gvp phase-ii ocp (c). 200 kw, 3.3kv dol er make prabhu si. no. ht582 of gvp phase-ii ocp (d). 180kw,
(1) repairing of (a). 325kw, 3.3kv dol er si. no. sa-1619 of gvp phase-ii ocp (b). 240kw, 3.3kv dol er si. no. sa-1617 of rkb pump of gvp phase-ii ocp (c). 200 kw, 3.3kv dol er make prabhu si. no. ht582 of gvp phase-ii ocp (d). 180kw,
Read moreEmergent repairing of workshop building ( welding shop machine shop foundry shop and carpentry shop) at jalpaiguri govt engineering college under jalpaiguri construction division pwd jalpaiguri during the year 2025-26
Emergent repairing of workshop building ( welding shop machine shop foundry shop and carpentry shop) at jalpaiguri govt engineering college under jalpaiguri construction division pwd jalpaiguri during the year 2025-26
Read moreRmo of lifts in b block at gipmer, new delhi sh repairing of 3 nos. omega make lifts installed at mac block
Rmo of lifts in b block at gipmer, new delhi sh repairing of 3 nos. omega make lifts installed at mac block
Read moreAmc of 1 no. passenger cum bed elevators installed in kamla nehru hospital for mother and child at block b shimla for the period of 3 years. johnson make.
Amc of 1 no. passenger cum bed elevators installed in kamla nehru hospital for mother and child at block b shimla for the period of 3 years. johnson make.
Read moreRepairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Read moreComplete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area
Complete repairing and rewinding of 500 kva, 3.3kv/440v transformer, 3 phase, make marsons calcutta, sl. no. 8675 installed at main sump under kdh project, nk area
Read moreSupply of submersible pump set isi mark v-8 type 25 h.p. 1700 lpm discharge, 45 m head. 2900 rpm with double lead of pvc flat cable 3 core 6 sq mm in 5 m. length, 3 phase, 415 volt 50 hz. at central store, tubewell division, roorkee.
Supply of submersible pump set isi mark v-8 type 25 h.p. 1700 lpm discharge, 45 m head. 2900 rpm with double lead of pvc flat cable 3 core 6 sq mm in 5 m. length, 3 phase, 415 volt 50 hz. at central store, tubewell division, roorkee.
Read moreSupply of submersible pump set isi mark v-8 type 15 h.p. 1700 lpm discharge, 28m head, 2900 rpm with double lead of pvc flat cable 3 core 4 sq.mm in 5m length, 3 phase , 415 volt 50 hz at central store, tubewell division, roorkee
Supply of submersible pump set isi mark v-8 type 15 h.p. 1700 lpm discharge, 28m head, 2900 rpm with double lead of pvc flat cable 3 core 4 sq.mm in 5m length, 3 phase , 415 volt 50 hz at central store, tubewell division, roorkee
Read moreof your Industry type