Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Earthwork For Excavation Of Trenches For Laying Of Underground Pipeline Lowering And Jointing Of 350 Mm Diameter Rcc Pipes Fixing Of Air Vent Pipes Risers Alpha Alpha Valves Pump Stand
|
| Description |
Earthwork For Excavation Of Trenches For Laying Of Underground Pipeline Lowering And Jointing Of 350 Mm Diameter Rcc Pipes Fixing Of Air Vent Pipes Risers Alpha Alpha Valves Pump Stand At Village Humbran Teshil Derabassi District Sas Nagar
|
| Organisation | Government of Punjab |
| Tender Id | 2023_DOA_105311_1 |
|
Reference Number |
DSWC/DSCO/MOHALI-04/2023-24 |
| Tender Fee | 1000 |
| EMD | 12750 |
| Tender Value | - |
| Place | SAS Nagar |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in |
| Start Date | July 06, 2023 14:40 |
| End Date |
Expired
12/07/2023
Expired 1192 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Read moreEarthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Earthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreEarthwork for excavation of trenches for laying of underground pipeline lowering and jointing of 350 mm diameter rcc pipes fixing of air vent pipes risers alpha alpha valves pump stand
Earthwork for excavation of trenches for laying of underground pipeline lowering and jointing of 350 mm diameter rcc pipes fixing of air vent pipes risers alpha alpha valves pump stand village humbran
Read moreEarthwork in excavation of trenches, fixing of air vent pipes, risers, construction of haudies, laying, lowering and jointing of rcc pipe line of 500 mm diameter of underground pipeline and pvc pipes
Earthwork in excavation of trenches, fixing of air vent pipes, risers, construction of haudies, laying, lowering and jointing of rcc pipe line of 500 mm diameter of underground pipeline and pvc pipes
Read moreEarthwork in excavation of trenches, fixing of air vent pipes, risers, construction of haus, laying, lowering and jointing of rcc pipe line of 350 mm diameter in village burj hari outlet no. 15584/r teh-mansa in district mansa
Earthwork in excavation of trenches, fixing of air vent pipes, risers, construction of haus, laying, lowering and jointing of rcc pipe line of 350 mm diameter in village burj hari outlet no. 15584/r teh-mansa in district mansa
Read moreRun off control structures crate wire structure earthwork for excavation of trenches for laying of underground pipeline lowering and jointing of 300 mm diameter rcc pipes fixing of air vent pipes risers and alfa alfa village fatehpur jattan nad
Run off control structures crate wire structure earthwork for excavation of trenches for laying of underground pipeline lowering and jointing of 300 mm diameter rcc pipes fixing of air vent pipes risers and alfa alfa village fatehpur jattan nad
Read moreEarthwork in excavation of trenches, fixing of air vent pipes, risers, construction of haus, laying, lowering and jointing of rcc pipe line of 250 mm, 400 mm and 500 mm diameter of underground pipeline in district mansa at mansa.
Earthwork in excavation of trenches, fixing of air vent pipes, risers, construction of haus, laying, lowering and jointing of rcc pipe line of 250 mm, 400 mm and 500 mm diameter of underground pipeline in district mansa at mansa.
Read moreEarthwork in excavation of trenches, fixing of air vent pipes, risers, construction of roof top rain water harvesting project (pvc), govt. secondary school,vill- jhanduke, teh- sardulgarh, dist-mansa
Earthwork in excavation of trenches, fixing of air vent pipes, risers, construction of roof top rain water harvesting project (pvc), govt. secondary school,vill- jhanduke, teh- sardulgarh, dist-mansa
Read moreof your Industry type