Tender Details

Particulars Details
Title
Pcc Road And Drain
Description
I. Alok Mehta House To Sanjay Dubey House Ii. Ramashish Pandey To Ranjit Singh House Iii. Naveen Pathak To Sudarshan Mehta House Iv. Haridwar Mehta To Uday Pal House V. Sanchita Upadhyay To Lalmani Ojha House Vi. Late Virodhi Singh To Satyanarayan .
Organisation Government of Jharkhand
Tender Id 2023_UDD_78908_1
Reference
Number
UDHD/MMC/30/2023-24
Tender Fee 10000
EMD 1.98 Lakh
Tender Value
Place MEDININAGAR MUNICIPAL CORPORATION
Link https://jharkhandtenders.gov.in
Start Date December 16, 2023 15:30
End Date

04/01/2024 ( Expired 498 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Empanelment of road safety consultants for nhai projects

Empanelment of road safety consultants for nhai projects

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Procurement of aerolubes for jaguar and mirage aircraft

Procurement of aerolubes for jaguar and mirage aircraft

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Supply installation testing and commissioning of chemical

Supply installation testing and commissioning of chemical

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise