Tender Details
Particulars | Details |
---|---|
Title |
Rectification Of Blackspots Tn 03 069 (Thadakoil), Accident Spot (Kakkathoppu) And Blackspot Tn 02 604 (Agaram Junction) By Construction Of Vu Ps And Service Road In Karur To Dindigul Section Of Nh 44 In The State Of Tamil Nadu On Epc Mode
|
Description |
Rectification Of Blackspots Tn 03 069 (Thadakoil), Accident Spot (Kakkathoppu) And Blackspot Tn 02 604 (Agaram Junction) By Construction Of Vu Ps And Service Road In Karur To Dindigul Section Of Nh 44 In The State Of Tamil Nadu On Epc Mode
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_220268_1 |
Reference Number |
NHAI/17011/01/115/2024/RO Madurai |
Tender Fee | 10000 |
EMD | 1.13 Crore |
Tender Value | |
Place | Karur - Dindigul |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=244795 |
Start Date | December 19, 2024 16:30 |
End Date |
18/01/2025 ( Expired 142 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode
Construction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode
Read moreCurve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Construction of 4 lane flyover at tehna junction on harike-faridkot-bathinda section of nh-54 at km. 225.272 in the state of punjab on epc mode
Read moreDesign and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Design and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Read moreRectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Read more4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
Read moreRectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Rectification at morth identified blackspots on mahua-jaipur section of nh 21 in the state of rajasthan on engineering, procurement and construction (epc) mode
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreRectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode
Rectification of 08 nos. morth identified blackspots on chittorgarh kota section of nh 27 in the state of rajasthan on engineering, procurement and construction (epc) mode
Read moreof your Industry type