Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Picking Of Shale/Stone/Timber/Tramp Iron And Other Foreign Materials
|
| Description |
Outsourcing Services Of Picking Of Shale/Stone/Timber/Tramp Iron And Other Foreign Materials From Coal On Running Conveyor Belts And Coal Yards At Ocp1 Chp Rg 3 Area
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 669994 |
|
Reference Number |
ER325O0176 |
| Tender Fee | 3764 |
| EMD | 1.06 Lakh |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | January 16, 2026 18:30 |
| End Date |
Expired
06/02/2026
Expired 248 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read morePicking of shale/stone/timber/tramp iron/foreign materials from coal on running conveyor belts
Outsourcing of picking of shale/stone/timber/tramp iron/foreign materials from coal on running conveyor belts and coal yards on quantity basis required at gdkcm (no.2,2a and 5), rg.1 area for a period of 2 years
Read morePicking of shale, stone, timber from running belts
Outsourcing of picking of shale, stone, timber, tramp iron and other foreign material from the coal conveyors belts running at a speed of 3.0 meters per second or less and stock coal yard at chp, srp area on quantity basis for a period of two years as per the scope of work, terms and conditions of nit
Read moreShale picking
Picking of shale/ stone/timber/tramp iron/ foreign material from coal on running conveyor belts or at stock coal yards (one shale picking point) of ktk oc-iii, bhp area for a period of 2 years
Read moreStone boulders and foreign material picking from running conveyors in
Stone boulders and foreign material picking from running conveyors inchp for ntpc lara.
Read moreFacility management services - lumpsum based - industrial; day to day shale/stone picking; consumab
Read more
of your Industry type