Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 2 Lane Rob (Railway Portion Only, Span 1x72 M, Bsg 1x30 M Composite Steel Girder) In Lieu Of Lc No. 38 A On Varanasi Zafrabad Jaunpur Section Near Zafrabad Station In Lucknow Division Of Northern Railway
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73810798 |
|
Reference Number |
1-Tender-CPM-C-BSB |
| Tender Fee | 0 |
| EMD | 13.31 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73810798/viewNitPdf_4492407.pdf |
| Start Date | February 26, 2024 16:53 |
| End Date |
Expired
18/03/2024
Expired 942 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Construction of rob 2 lane with carriage width of 7.5mtr with railway portion span 1x60m bsg 1x18mtr cg at km 425 33.5 in lieu of lc no. 215 and including lhs 1x5.0mx3.6m between panposh kalunga station at kalunga yard excl. railway portion work
Read moreConstruction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Construction of new lhs in lieu of lc gate no. 26 by railway s relieving girder under aen/bdc
Read moreConstruction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.162 as 1x36.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards kolar) + 2x18.71m psc girder+1x10.5m rcc slab (towards bangarpet) (approach span) + re blocks and retaining wall (approach portion)at km 144/900-145/000 and construction of pedestrian subway between bwt-kqz stations of ynk-bwt section of sbc division. (composite work)
Read moreConstruction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Construction of 2 lane rob in lieu of lc no.1 as 1x30.00m composite girder (railway span) + 3x18.71m psc girder+1x10.5m rcc slab (towards amaravathy nagar) + 2x18.71m psc girder+1x10.5m rcc slab (towards desihalli)(approach span)+ re blocks and retaining wall (approach portion)) at km 1/800-900 along with lhs between bwt-col stations of bwt-mkm section of sbc division. (composite work)
Read moreConstruction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreConstruction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.
Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.
Read more(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
(i)construction of new lhs in lieu of lc gate no. 24/02 by railway s relieving girder under aen/kwae.(ii)construction of new lhs in lieu of lc gate no. 21 at km 22/9-11 in az-nht section under aen/az. (iii)construction of new lhs in lieu of lc gate no. 22 at km 20 / 34-36 in az-nht section under aen/az.
Read morePreparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Preparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Read moreDesign, supply erection testing and commissioning of single phase, 50 hz, 25 kv ac ohe in connection with the additional work of jaunpur (jnu)-zafrabad (zbd) doubling including zafrabad yard and provision of two nos additional loop lines at mariahu yard of lucknow division of northern railway
Design, supply erection testing and commissioning of single phase, 50 hz, 25 kv ac ohe in connection with the additional work of jaunpur (jnu)-zafrabad (zbd) doubling including zafrabad yard and provision of two nos additional loop lines at mariahu yard of lucknow division of northern railway
Read moreElectrical general power supply work in connection with the following works over lucknow division of northern railway:(i) doubling of jaunpur-zafrabad section including zafrabad yard.(ii) varanasi-pt. deen dayal upadhyaya multitracking (15 km) works including vyas nagar yard.(iii)improvement of vyasnagar goods shed.
Electrical general power supply work in connection with the following works over lucknow division of northern railway:(i) doubling of jaunpur-zafrabad section including zafrabad yard.(ii) varanasi-pt. deen dayal upadhyaya multitracking (15 km) works including vyas nagar yard.(iii)improvement of vyasnagar goods shed.
Read moreof your Industry type