Tender Details
Particulars | Details |
---|---|
Title |
Refurbishment Of Shatabdi And Similar Types Of Coaches (Ac Lhb Chair Car &Amp Executive Chair Car) As Per Scope Of Work At Lower Parel Workshop.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77800444 |
Reference Number |
WR-PL-ME-EST-518009 |
Tender Fee | 0 |
EMD | 7.38 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77800444/viewNitPdf_4734449.pdf |
Start Date | October 17, 2024 15:51 |
End Date |
18/11/2024 ( Expired 179 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation 215 nos and repairing 18 nos work of rain water harvesting work at various location in ratlam city as per estimate and conditions
Installation 215 nos and repairing 18 nos work of rain water harvesting work at various location in ratlam city as per estimate and conditions
Read moreProviding laying jointing and interconnection work of hdpe pipeline at surajmal jain nagar ratlam as per estimate
Providing laying jointing and interconnection work of hdpe pipeline at surajmal jain nagar ratlam as per estimate
Read moreWork of tree shifting and maintenance as per requirement on both sides of the road at various places in the development authority area.
Work of tree shifting and maintenance as per requirement on both sides of the road at various places in the development authority area.
Read moreDismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Dismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Read moreConstruction of arts and craft room at west santinagar high school of kalyanpur rd block area under rd teliamura division/sh-providing permanent internal electrification work thereof (as per pwd sor i/electrification- 2021).
Construction of arts and craft room at west santinagar high school of kalyanpur rd block area under rd teliamura division/sh-providing permanent internal electrification work thereof (as per pwd sor i/electrification- 2021).
Read moreConstruction of additional class room/laboratory (2 nos addl class room and 4 nos laboratory) at asharambari h.s school of tulashikhar rd block under rd teliamura division/sh-providing internal electrification work thereof.(as per pwd sor i/e 2021)
Construction of additional class room/laboratory (2 nos addl class room and 4 nos laboratory) at asharambari h.s school of tulashikhar rd block under rd teliamura division/sh-providing internal electrification work thereof.(as per pwd sor i/e 2021)
Read moreHiring of hydraulic excavator for earth work excavation, demolition, lifting and moving of heavy material etc. (as per the requirement) at foa wadura, skuast-k.
Hiring of hydraulic excavator for earth work excavation, demolition, lifting and moving of heavy material etc. (as per the requirement) at foa wadura, skuast-k.
Read moreGeneral repair, special repair and m.o.w. work of residential and non-residential buildings under pwd division guna at zonal level (as per work approval and requirement) year 2025-26
General repair, special repair and m.o.w. work of residential and non-residential buildings under pwd division guna at zonal level (as per work approval and requirement) year 2025-26
Read moreThe work of replacing damaged poles and tightening loose wires of lt/ht lines as per requirement
The work of replacing damaged poles and tightening loose wires of lt/ht lines as per requirement in&#x0d the jurisdiction of the electricity distribution sub-division-mohammadpur
Read moreAfforestation of 9000 saplings work at kiom ml no 1111 at c block for the year 2025 26 as per r and r plan including 3 years maintenance after planting of saplings
Afforestation of 9000 saplings work at kiom ml no 1111 at c block for the year 2025 26 as per r and r plan including 3 years maintenance after planting of saplings
Read moreof your Industry type