Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Kyip Acp Plan 2023 24 Kyip Acp Plan 2023 24 Rectification Works To
|
| Description |
Plan Work
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_601856_1 |
|
Reference Number |
IRR/PI/TR/4310/2023_5_1_1/1 |
| Tender Fee | 2760 |
| EMD | 31769 |
| Tender Value | - |
| Place | KyIP(O,M) Subdivision, Peruvannamuzhi, PIN - 673 |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | September 13, 2023 00:25 |
| End Date |
Expired
20/09/2023
Expired 1100 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreGeneral-kyip acp plan 2023-24-rectification works to edakkara fb-general civil work
Plan work
Read moreGeneral-kyip acp 2023- 24-kyip acp plan 2023-24-rectification works to pillaperuvanna field bothie between ch.0.700km- 1.00km-general civil work
Plan work
Read moreGeneral-kyip acp 2023- 24-kyip acp 2023- 24 rectification works to lbmc between ch. 10.200km- 10.500km -general civil work
Plan work
Read moreGeneral-kyip acp plan 2024-25- rectification works to kannipoyil fb-general civil work
General-kyip acp plan 2024-25-&#x0d rectification works to kannipoyil fb-general&#x0d civil work
Read moreof your Industry type