Tender Details
Particulars | Details |
---|---|
Title |
New Construction Of Missing Link Between Vikas Khand Kheero Kanpur Lalganj Road (Lachhipur Ke Saamne) And Manpur Link Road
|
Description |
New Construction Of Missing Link Between Vikas Khand Kheero Kanpur Lalganj Road (Lachhipur Ke Saamne) And Manpur Link Road
|
Organisation | Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT |
Tender Id | 2025_CEUCZ_1000425_1 |
Reference Number |
415/401C(2)-LKOCIR/2024-25 DT. 17.01.2025 |
Tender Fee | 2714 |
EMD | 3.5 Lakh |
Tender Value | |
Place | RAEBARELI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1778206 |
Start Date | January 31, 2025 00:25 |
End Date |
07/02/2025 ( Expired 107 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConsultancy services for preparation of detailed project report for construction of grade separated structures for improvement of kalindi kunj intersection of delhi-noida road and agra canal road near okhla barrage new delhi
Consultancy services for preparation of detailed project report for construction of grade separated structures for improvement of kalindi kunj intersection of delhi-noida road and agra canal road near okhla barrage new delhi
Read moreConstruction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Read moreConstruction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read more(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.
(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.
Read moreof your Industry type