Tender Details

Particulars Details
Title
New Construction Of Missing Link Between Vikas Khand Kheero Kanpur Lalganj Road (Lachhipur Ke Saamne) And Manpur Link Road
Description
New Construction Of Missing Link Between Vikas Khand Kheero Kanpur Lalganj Road (Lachhipur Ke Saamne) And Manpur Link Road
Organisation Chief Engineer PWD Central Zone,Lucknow | State Govt. and UT
Tender Id 2025_CEUCZ_1000425_1
Reference
Number
415/401C(2)-LKOCIR/2024-25 DT. 17.01.2025
Tender Fee 2714
EMD 3.5 Lakh
Tender Value
Place RAEBARELI
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1778206
Start Date January 31, 2025 00:25
End Date

07/02/2025 ( Expired 107 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
Consultancy services for preparation of detailed project report for construction of grade separated structures for improvement of kalindi kunj intersection of delhi-noida road and agra canal road near okhla barrage new delhi

Consultancy services for preparation of detailed project report for construction of grade separated structures for improvement of kalindi kunj intersection of delhi-noida road and agra canal road near okhla barrage new delhi

Read more
Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode

Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.

Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.

Read more
Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction

Construction work of new 51 meter long pedestrian bridge in place of the 113 year old pedestrian suspension bridge situated on the saryu river in bageshwar constituency of bageshwar district. missing link in anticipation of sanction

Read more
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode

Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode

Read more
(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.

(molik nidhi) construction of cc road and drain work from lovely sweets se sikke ke maidan tak at zone 02 ward 09.file no.188/25x3/6.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise