Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Camera,Dvr,Hard Disk,Smp,Rake
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/R/309991 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 25, 2024 15:30 |
| End Date |
Expired
26/02/2024
Expired 959 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
DEVNAM PIYADASSI BRIXWELL PRIVATE LIMITEDVinayak EnterprisesDD ENTERPRISESOFFICE...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Crompton Briz Air Deco 1200mm Lustre Brown | crompton | Crompton Briz Air Deco 1200mm Lustre Brown | 12 | ₹ 28800.000 |
| NOTICE BOARD | NA | NA | 4 | ₹ 4600.000 |
| Samsung MLT-D203S Black Toner Cartridge | SAMSUNG | Samsung MLT-D203S Black Toner Cartridge | 60 | ₹ 333600.000 |
| file cover with printing | AU | file cover with printing | 300 | ₹ 3000.000 |
| SIMMTRONICS 2GB | Simmtronics | SIMMTRONICS 2GB DDR2 | 14 | ₹ 14000.000 |
| File Tag Green | Unbranded | File Tag Green-v18 | 372 | ₹ 49848.000 |
| Microsoft Officestd 2016 SNGL OLP C | Microsoft | Microsoft & Officestd 2016 SNGL OLP C | 1 | ₹ 14800.000 |
| Electrical Wire 4mm Bundle 90M | finolex | 4m-CU-AL | 6 | ₹ 37800.000 |
| SURF EXCEL EASY WASH | surf excel | SURF EXCEL BLUE | 15 | ₹ 1638.750 |
| MULTIMEDIA PROJECTOR | Hitachi | HITACHI CP-X2542WN | 1 | ₹ 37280.000 |
| hp desktop | hp | HP Slimline 270-p020il | 2 | ₹ 64798.000 |
| GODREJ COMPUTER TABKE C11 | GODREJ INTERIO | GODREJ COMPUTER TABKE C11 | 2 | ₹ 17560.000 |
| CDMA Trainer | Tatame | Tatame TTCDMATR | 1 | ₹ 49990.000 |
| MEDICAL REIMBURSEMENT CLAIM FORM | PARAS | PARAS MEDICAL REIMBURSEMENT CLAIM FORM | 10 | ₹ 950.000 |
| best and more reliable weighing scale | Omron | hn289 omron | 25 | ₹ 49999.750 |
| Carrier split AC | Carrier | CAS18DF3N8F0/2018 | 1 | ₹ 37850.000 |
| File wrapper or flap | NA | wrapper | 600 | ₹ 2580.000 |
| file cabinet four drawer (NV) | N.V. | NV-FC-001 | 1 | ₹ 8900.100 |
| HP 204A Cyan LaserJet Toner Cartridge CF511A | hp | HP 204A Cyan LaserJet Toner Cartridge CF511A | 2 | ₹ 6986.000 |
| HP 204A Yellow LaserJet Toner Cartridge CF512A | hp | HP 204A Yellow LaserJet Toner Cartridge CF512A | 2 | ₹ 6986.000 |
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreDesign, development, supply, implementation, operation & maintenance of a web-based intelligent bus operation management system (iboms) , application for online bus booking system “where is my bus” and ai enabled camera for passenger counting for bihar state road transport corporation
Design, development, supply, implementation, operation & maintenance of a web-based intelligent bus operation management system (iboms) , application for online bus booking system “where is my bus” and ai enabled camera for passenger counting for bihar state road transport corporation
Read morePandal work , toran gate , lcd screen, cctv camera, (fully lighting arrangement , loudspeaker or sound amplifier , chair, table, drink water etc for 4 days ) on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Pandal work , toran gate , lcd screen, cctv camera, (fully lighting arrangement , loudspeaker or sound amplifier , chair, table, drink water etc for 4 days ) on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type