Tender Details

About Tender

🛣️ Invitation For Consultancy Services Nh 47 Up Gradation 🛣️ The Ministry Of Road Transport And Highways, Central Government, Invites Bids From Experienced Consultants For The Role Of Independent Engineer For The Up Gradation Of Nh 47 From Narol Junction To Sarkhej Junction In Gujarat. 🗺️ 📆 Bid Submission Deadline: May 20, 2024, 3:00 Pm Tender Fee: Inr 5000 This Project Encompasses The Enhancement Of An Existing 6 Lane Road, Including The Construction Of An Elevated Corridor, From Km 0/00 To Km 10/170. Interested Consultants Should Submit Detailed Proposals, Highlighting Their Expertise And Experience In Similar Infrastructure Projects. Keywords: Consultancy Services, Independent Engineer, Nh 47 Up Gradation, Road Infrastructure, Ministry Of Road Transport And Highways, Government Tender, Bid, Gujarat
Particulars Details
Title
Consultancy Services Of Independent Engineer For Up Gradation Of Existing 6 Lane Road Including Elevated Corridor As Per Site Requirements From Km 0/00 To Km 10/170 Of Nh 47 (Narol Junction To Sarkhej Junction) In The State Of Gujarat (Total Length
Description
Consultancy Services Of Independent Engineer For Up Gradation Of Existing 6 Lane Road Including Elevated Corridor As Per Site Requirements From Km 0/00 To Km 10/170 Of Nh 47 (Narol Junction To Sarkhej Junction) In The State Of Gujarat (Total Length
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_800879_1
Reference
Number
2023-24-NH/47/IE
Tender Fee 5000
EMD 0
Tender Value
Place Ahmedabad
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=841864
Start Date June 15, 2024 22:45
End Date

06/07/2024 ( Expired 350 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode

Read more
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders

Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise