Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Guntakal Division Electrification Of Tm Sidings/Ballast Sidings/Pqrs Sidings For 35 Station Yards Of Gtl Division.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77231747 |
|
Reference Number |
GTL-TRD-29-eTN-18-2024-25 |
| Tender Fee | 0 |
| EMD | 3.26 Lakh |
| Tender Value | - |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092024/77231747/viewNitPdf_4704408.pdf |
| Start Date | September 06, 2024 01:20 |
| End Date |
Expired
27/09/2024
Expired 748 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Guntakal division: repairs and painting works of foot over bridges in sr.den/south/gtl jurisdiction.
Guntakal division: repairs and painting works of foot over bridges in sr.den/south/gtl jurisdiction.
Read moreReplacement of bent/leaned masts in yards along with protection of masts by providing sacrificial masts in sidings in chennai division.
Replacement of bent/leaned masts in yards along with protection of masts by providing sacrificial masts in sidings in chennai division.
Read moreGuntakal division: proposed annual maintenance of water level monitoring system in the waterway bridges for three years- total 7 bridges (ru-gy 579 up, gdr-ru 59 up, gdr-ru 118 dn, klu-gy 45, ru-gy 688 dn, gtl-wd 1017dn, bay-gtl 292 up)
Guntakal division: proposed annual maintenance of water level monitoring system in the waterway bridges for three years- total 7 bridges (ru-gy 579 up, gdr-ru 59 up, gdr-ru 118 dn, klu-gy 45, ru-gy 688 dn, gtl-wd 1017dn, bay-gtl 292 up)
Read moreGuntakal division: sw1: ru-nre & gdr-ru-kpd sec: provision of cradle arrangement work for various major bridges and robs in sse/br/ru jurisdiction. sw2: bay-gtl, gy-klu & dmm-pak section: provision of cradle arrangements for the various major bridges and robs in sse/br/central/gtl jurisdiction.
Guntakal division: sw1: ru-nre & gdr-ru-kpd sec: provision of cradle arrangement work for various major bridges and robs in sse/br/ru jurisdiction. sw2: bay-gtl, gy-klu & dmm-pak section: provision of cradle arrangements for the various major bridges and robs in sse/br/central/gtl jurisdiction.
Read moreManufacturing ,supplying machine crushed track ballast, stacking at sptr, nsbg, or anyother suitable yards and loading it into hoppers/wagons/ trucks for various sections/locations under the jurisdiction of sr. den/ii/tsk.
Manufacturing ,supplying machine crushed track ballast, stacking at sptr, nsbg, or anyother suitable yards and loading it into hoppers/wagons/ trucks for various sections/locations under the jurisdiction of sr. den/ii/tsk.
Read moreSupply of 36176.80 cum 65 mm gauge machine crushed stone ballast for b.g. track duly stacked on cess and putting the same into track for ambala, khanalampura, chandigarh, bathinda & patiala yards under ambala division.
Supply of 36176.80 cum 65 mm gauge machine crushed stone ballast for b.g. track duly stacked on cess and putting the same into track for ambala, khanalampura, chandigarh, bathinda & patiala yards under ambala division.
Read moreProposed welding & gas cutting of various parts in connection with track machines at ioh depot/kur and reconditioning spare parts of bcm & pqrs/ sqrs at base bcm machines base station & pqrs/sqrs base depots & at site of other track machines working in kur division under dy.ce/ sen/ aden/ tm of khurda road division for the period of 24 months (i.e. year 2026-27-28)
Proposed welding & gas cutting of various parts in connection with track machines at ioh depot/kur and reconditioning spare parts of bcm & pqrs/ sqrs at base bcm machines base station & pqrs/sqrs base depots & at site of other track machines working in kur division under dy.ce/ sen/ aden/ tm of khurda road division for the period of 24 months (i.e. year 2026-27-28)
Read moreGuntakal division: 1. guntakal- electrical arrangements for the proposed construction of staff quarters type-vi-1 unit for drm/gtl on replacement account.2. kalluru-electrical arrangements for the proposed construction of staff quarters type-iv(1 unit) and type-iii(1 unit) for sse & je/p.way/klu.3. tadipatri - electrical arrangements for the proposed construction of staff quarters type-iv - 01 unit for sse/signal and type-iii 2 units one each for je/p.way and je/signal.
Guntakal division: 1. guntakal- electrical arrangements for the proposed construction of staff quarters type-vi-1 unit for drm/gtl on replacement account.2. kalluru-electrical arrangements for the proposed construction of staff quarters type-iv(1 unit) and type-iii(1 unit) for sse & je/p.way/klu.3. tadipatri - electrical arrangements for the proposed construction of staff quarters type-iv - 01 unit for sse/signal and type-iii 2 units one each for je/p.way and je/signal.
Read moreEngineering, procurement and construction (epc) contract for doubling of track between katpadi and tirupati stations from km 0.85 to km 103.84 excluding chittoor yard from km 31.80 to km 34.50 with signalling & telecommunication, electrification works including augmentation of existing 1x25kv tss/ssp/sp to suit proposed second line in guntakal division of south coast railway.
Engineering, procurement and construction (epc) contract for doubling of track between katpadi and tirupati stations from km 0.85 to km 103.84 excluding chittoor yard from km 31.80 to km 34.50 with signalling & telecommunication, electrification works including augmentation of existing 1x25kv tss/ssp/sp to suit proposed second line in guntakal division of south coast railway.
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreof your Industry type