Tender Details
Particulars | Details |
---|---|
Title |
Extra Manpower For Overhauling Jobs Related To Davr Commissioning And Dcs Tit Bit Updating Related Jobs Of U 4, Bktpp And Extra Manpower For Overhauling Jobs Related To New Dcs Up Gradation And Signal Checking Of U 1, Bktpp
|
Description |
Extra Manpower For Overhauling Jobs Related To Davr Commissioning And Dcs Tit Bit Updating Related Jobs Of U 4, Bktpp&Amp#X0d
And&Amp#X0d
Extra Manpower For Overhauling Jobs Related To New Dcs Up Gradation And Signal Checking Of U 1, Bktpp
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id | 2025_WBPDC_826435_1 |
Reference Number |
WBPDCL/BKTPP/NIT/E3639/24-25 |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | Bakreswar Thermal Power Plant |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1839713 |
Start Date | March 13, 2025 16:30 |
End Date |
24/03/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreHiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years
Read moreLaying of cable from 11kv switch yard to 2x1500kva pmpgh (new) substation with laying gravels in switchyard area, laying of cable for colony substation from nearly 4 pole structure and complete maintenance and overhauling of 07 goab switches of nsch,
Laying of cable from 11kv switch yard to 2x1500kva pmpgh (new) substation with laying gravels in switchyard area, laying of cable for colony substation from nearly 4 pole structure and complete maintenance and overhauling of 07 goab switches of nsch,
Read moreDeployment of manpower for clinker related job of boiler (u1 to u5) and repairing / refurbishment job of ahp, bktpp for two years
Deployment of manpower for clinker related job of boiler (u1 to u5) and repairing / refurbishment job of ahp, bktpp for two years
Read moreHiring of latest model-2025 of 1 no. new petrol car (4plus1-seater) / equivalent or utilization period of petrol car up to 04 years or 1,50,000 kms. and registration in taxi quota for official/field use of se (eht-m) circle, mpptcl, jabalpur
Hiring of latest model-2025 of 1 no. new petrol car (4plus1-seater) / equivalent or utilization period of petrol car up to 04 years or 1,50,000 kms. and registration in taxi quota for official/field use of se (eht-m) circle, mpptcl, jabalpur
Read moreMaking of ash pipe thrust block, cleaning boiler blow down sump, condenser sump and other tit bit work related to overhauling of unit3, 2025 at sgtpp, wbpdcl.
Making of ash pipe thrust block, cleaning boiler blow down sump, condenser sump and other tit bit work related to overhauling of unit3, 2025 at sgtpp, wbpdcl.
Read moreWork of hydrogen gas cylinders testing, painting and providing and installation of new valves if required, as per is 3224 for 4x250 mw generators of unit-1 to 4 ctpp, chhabra as per gas cylinder rules 1981 under indian explosive act 1884 and 2004.
Work of hydrogen gas cylinders testing, painting and providing and installation of new valves if required, as per is 3224 for 4x250 mw generators of unit-1 to 4 ctpp, chhabra as per gas cylinder rules 1981 under indian explosive act 1884 and 2004.
Read moreAnnual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Read moreOverhauling of 6.6 kv ht motors of u-4, u-2 and u-1, bktpp during respective unit overhauling
Overhauling of 6.6 kv ht motors of u-4, u-2 and u-1, bktpp during respective unit overhauling
Read moreConsultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Consultancy services for preparation of detailed project report (dpr) for (1).construction of 4l rob at km 33.100 and km 35.660 (2) 4l major bridge at km 32.000 (3). upgradation to 4 lane from km 45.400 to km 46.200 on nh-330b in the state of up.
Read moreof your Industry type