Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Spade,Shovel Belcha As Per Is 274 (Part 1, Part 2 And Part 3)
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5229436 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 17, 2024 18:38 |
| End Date |
Expired
27/08/2024
Expired 775 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ASHISH ENTERPRISES | Make : Model : | 27-08-2024 10:21:39 | N/A | Evaluated |
| 2 | GAURVANSHI ENTERPRISES | Make : NA Model : DAAARTS/2022/2856719 | 25-08-2024 08:19:24 | N/A | Evaluated |
| 3 | KALLU WELDING WORK | Make : NA Model : DAAARTS/2022/2856719 | 26-08-2024 22:45:36 | N/A | Evaluated |
| 4 | MAHI ENTERPRISES | Make : NA Model : DAAARTS/2022/2856719 | 24-08-2024 20:41:13 | N/A | Evaluated |
| 5 | N V SUPPLIER AND SERVICES | Make : Model : | 27-08-2024 11:12:23 | N/A | Evaluated |
| 6 | O P BALDWA/ OM ENTERPRISES | Make : NA Model : DAAARTS/2022/2856719 | 27-08-2024 12:46:36 | N/A | Evaluated |
| 7 | R.K TRADERS | Make : NA Model : DAAARTS/2022/2856719 | 26-08-2024 21:22:43 | N/A | Evaluated |
| 8 | SHREE BALAJI TRADING COMPANY | Make : NA Model : DAAARTS/2022/2856719 | 27-08-2024 13:21:13 | N/A | Evaluated |
Procurement of tarpalin for shovel section rg ocp-iii rg-ii area
Procurement of tarpalin for shovel section rg ocp-iii rg-ii area
Read moreRepairing of rhs propel drive (35720511000) rpd42 applicable for ekg10 cum rope shovel.
Repairing of rhs propel drive (35720511000) rpd42 applicable for ekg10 cum rope shovel.
Read moreProcurement of d shackles for use at shovel section, rgocp-iii, rg-ii area.
Procurement of d shackles for use at shovel section, rgocp-iii, rg-ii area.
Read moreProcurement of kirloskar make 12bhp ta2 engine spares for shovel selection ocp-iii rg-ii on open enquiry basis
Procurement of kirloskar make 12bhp ta2 engine spares for shovel selection ocp-iii rg-ii on open enquiry basis
Read morePurchase of hydraulic shovel metal pipe clamps for ex1900 and be1800 hydraulic shovels working at rgocp-iii rg-ii area
Purchase of hydraulic shovel metal pipe clamps for ex1900 and be1800 hydraulic shovels working at rgocp-iii rg-ii area
Read moreProcurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Read moreProcurement of ashok leyland make 1618 and 1920 model mobile service can spares for shovel section ocp-iii, rg-ii on open enquiry basis
Procurement of ashok leyland make 1618 and 1920 model mobile service can spares for shovel section ocp-iii, rg-ii on open enquiry basis
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type