Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Guntakal Division Electrification Of Phase Ii Of Arv Siding At Yadalapur Of Gtl Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73619496 |
Reference Number |
GTL-TRD-29-eTN-44-2023-24 |
Tender Fee | 0 |
EMD | 2.06 Lakh |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73619496/viewNitPdf_4482699.pdf |
Start Date | March 07, 2024 23:52 |
End Date |
01/04/2024 ( Expired 463 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Design, supply, installation, testing and commissioning of open loop emv ncmc card and qr code based automatic fare collection (afc) system along with camc for nagpur metro rail project phase-ii
Read moreCertain repair to otm accn of armd regt i and asc coy under age b/r-ii at nams
Certain repair to otm accn of armd regt i and asc coy under age b/r-ii at nams
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConsultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Read moreConstruction of tech infra and allied services at bikaner and mffr under ge p bikaner phase ii of ii phases on epc mode
Construction of tech infra and allied services at bikaner and mffr under ge p bikaner phase ii of ii phases on epc mode
Read moreStrengthening and improvement of roads under world bank aided project tresp in ompi block under amarpur division, pwd (randb). gr-ii
Strengthening and improvement of roads under world bank aided project tresp in ompi block under amarpur division, pwd (randb). gr-ii
Read moreProvn of md accn (phase-ii of two phases) at missamari under ge missamari
Provn of md accn (phase-ii of two phases) at missamari under ge missamari
Read moreConstruction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.
Construction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.
Read moreProcurement of roller bearings for stage i and ii at ghtp, lehra mohabbat
Procurement of roller bearings for stage i and ii at ghtp, lehra mohabbat. total quantity as per nit.
Read moreProcurement of ball bearing for stage i and ii at ghtp, lehra mohabbat
Procurement of ball bearing for stage i and ii at ghtp, lehra mohabbat. total quantity as per nit.
Read moreof your Industry type