Tender Details
Particulars | Details |
---|---|
Title |
Kklis Mhaisal Lift Irrigation Scheme Jath Part Construction Of Sangola Gravity Main Km 8.760 37.680 And Minor 1 And Its Disnet For Tank Feeding In Deprived Villages Of Sangola Including
|
Description |
Kklis Mhaisal Lift Irrigation&Amp#X0d
Scheme Jath Part Construction Of Sangola Gravity Main Km 8.760 37.680 And Minor 1 And Its Disnet For Tank&Amp#X0d
Feeding In Deprived Villages Of Sangola Including&Amp#X0d
Operation Maintenance And
|
Organisation | CE-Water Resources Dept. Pune | State Govt. and UT |
Tender Id | 2024_CWRDP_1031574_1 |
Reference Number |
NOTICE NO 09 FOR 2023-24 |
Tender Fee | 5900 |
EMD | 24.8 Lakh |
Tender Value | |
Place | SANGOLA |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1803647 |
Start Date | March 11, 2024 15:30 |
End Date |
01/04/2024 ( Expired 405 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreSpecial repair to sewage line for type iii md accn at matri complex special repair to roof gutter of grc group bld no p 192 and provision of septic tank and soak well and allied services at main gate of technical area in r and de e pune
Special repair to sewage line for type iii md accn at matri complex special repair to roof gutter of grc group bld no p 192 and provision of septic tank and soak well and allied services at main gate of technical area in r and de e pune
Read moreConstruction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.
Construction of new g plus 1 storied building in the campus of cftc budge budge -- electrical installation, lift, ac, ups, dg set, solar system, fire detection and allied works - sitc of dg set.
Read moreConstruction of drainage scheme for krankshivan colony ( 1-4) mc sopore and construction of drainage scheme for chinkipora( 14-18)
Construction of drainage scheme for krankshivan colony ( 1-4) mc sopore and construction of drainage scheme for chinkipora( 14-18)
Read moreAnnual rate contract for repairng/maintance/ new construction under various scheme in hostel/ashram/ school and special institution via alotment given in whole finicial year time to time by govt/ tribal work department work like (repairing of toil
Annual rate contract for repairng/maintance/ new construction under various scheme in hostel/ashram/ school and special institution via alotment given in whole finicial year time to time by govt/ tribal work department work like (repairing of toil
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.
Canal water based water supply project for construction of 2.0 mld water treatment plant (wtp) and other related works including 5 years operation and maintenance (part-2) at amargarh, district malerkotla, punjab under amrut 2.0 scheme.
Read moreConstruction of distribution system for 4924.04 ha. of cca including command area development (cad) of salandi left main canal from rd 49.810 km to 59.970 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 4924.04 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 49.810 km to 59.970 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreof your Industry type