Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Brg. Assly Components In As Cast Condition With Machining Allowances Minimum 5 To 7 Mm On Each Tool
|
Description |
|
Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
Tender Id | GEM/2023/B/3564811 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | June 13, 2023 22:35 |
End Date |
04/07/2023 ( Expired 735 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | ABHA POWER AND STEEL PRIVATE LIMITED | Make : APS Model : BRG. ASSLY COMPONENTS IN AS CAST CONDITION WITH MA Title : BRG. ASSLY COMPONENTS | 08-07-2023 11:55:45 | MII MSE | Disqualified |
2 | GALLARD STEEL LIMITED | Make : Gallard Steel Limited Model : 6FRA 6068 Title : 6FRA 6068 | 04-07-2023 15:02:43 | MII | Qualified |
3 | M/S AKSHAY INDUSTRIES | Make : OEM Model : BRG. ASSLY COMPONENTS IN AS CAST CONDITION WITH MA Title : BRG. ASSLY COMPONENTS IN AS CAST CONDITION WITH MACHINING ALLOWANCES MINIMUM 5 TO 7 MM ON EACH TOOL | 03-07-2023 16:08:23 | MII MSE | Disqualified |
4 | NATRAJ IRON & CASTINGS PRIVATE LIMITED | Make : NIC Model : BRG. ASSLY COMPONENTS Title : BRG. ASSLY COMPONENTS | 19-06-2023 16:57:52 | MII MSE | Disqualified |
5 | NIPHA EXPORTS PVT LTD | Make : NIPHA Model : BRG. ASSLY COMPONENTS IN AS CAST CONDITION WITH MA Title : BRG. ASSLY COMPONENTS IN AS CAST CONDITION WITH MACHINING ALLOWANCES MINIMUM 5 TO 7 MM ON EACH TOOL | 04-07-2023 18:10:01 | MII | Qualified |
6 | PORWAL AUTO COMPONENTS LTD | Make : PACL Model : TRACTION MOTORS PARTS Title : 11 assembly components IN ROUGH MACHINED of traction machine 6FRA6068 | 30-06-2023 12:32:15 | MII | Qualified |
7 | WARDHMAN ELECTRO ENGINEERING WORKS | Make : TEST Model : Arm Fan Title : Ventilator Fan | 04-07-2023 19:57:27 | MII MSE | Disqualified |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreSurf wk with gsb 15 cm, sand blanketing, wmm 75 mm, wmm 100 mm dbm 50 mm and bc 30 mm thick, prime and tack coat, earthen shoulders and rd marking bet km 0.00 to km 14.457 on rd tang-s/chingnyu under 100 rcc/15 brtf under (p) sewak in nagaland state
Surf wk with gsb 15 cm, sand blanketing, wmm 75 mm, wmm 100 mm dbm 50 mm and bc 30 mm thick, prime and tack coat, earthen shoulders and rd marking bet km 0.00 to km 14.457 on rd tang-s/chingnyu under 100 rcc/15 brtf under (p) sewak in nagaland state
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply works (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, ai based cwims and cmms and 7 years of om for entire water supply (except intake to wtp) on dbo basis in amaravati
Survey, investigation, design, construction of balance works, testing, commissioning of water supply works (clear water pump house (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, a.i based centralized water information management system (cwims) computerized maintenance management system (cmms) and 7 years om for entire water supply (except intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiv)
Read moreRepair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb fund distt jalandhar
Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structure) with 5 year maintenance under nabard loan/mc/mb funds distt jalandhar
Read moreProv laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak
Read moreUpgradation of northern byepass patiala rd 0.00 t0 4.73 kms 4.73km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Upgradation of northern byepass patiala rd 0.00 t0 4.73 kms 4.73km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Read moreUpgradation of patiala-sanour road rd-3.60 t0 7.60 kms 4.00km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Upgradation of patiala-sanour road rd-3.60 t0 7.60 kms 4.00km in patiala under head 5054 rb-10 year 2023-24 with 5 years routine maintenance after completion of work 2nd year to 5th year 1st year will be considered as defect liability period
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 20.000 on kondapalli-dharmavaram road
Surfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 20.000 on kondapalli-dharmavaram road
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 9.250 on puwarti-kondapalli road
Surfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 9.250 on puwarti-kondapalli road
Read moreSurfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on puwarti-gomaguda road between km 0.000 to km 14.350
Surfacing works of gsb 15 cm thick, wbm 75 mm thick, dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification on puwarti-gomaguda road between km 0.000 to km 14.350
Read moreof your Industry type