Tender Details
Particulars | Details |
---|---|
Title |
Mtc Of Road From Gunjaria Tilla To Asharampara Road (L 0.35 Km) Under Amc Ward No. 37, 14 Badharghat Assembly Constituency During The Year 2025 26
|
Description |
Sh Patch Soling, Metaling, Grouting, Carpeting, Drain Work Etc.
|
Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 42214 |
Tender Value | |
Place | AGARTALA |
Link |
AAAAAAAAAA Login to view |
Start Date | June 04, 2025 16:50 |
End Date |
18/06/2025 ( 10 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Read moreRcc drain repayring work ward no. 1 to 21 for year 2025-26
Rcc drain repayring work ward no. 1 to 21 for year 2025-26 at under nagar palika parishad pipariya district narmdapuram mp.
Read moreCc road repayring work ward no. 1 to 21 for year 2025-26
Cc road repayring work ward no. 1 to 21 for year 2025-26 at under nagar palika parishad pipariya district narmdapuram mp.
Read moreConstruction of drain near coal mines from isai mohalla to kripal chowk main road at giriraj kishor kapoor ward under zone no. 3.
Construction of drain near coal mines from isai mohalla to kripal chowk main road at giriraj kishor kapoor ward under zone no. 3.
Read moreIrqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26
Irqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26
Read more(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
(i) cont. of h.l. bridge with approach road over chas nala at 5th km of dhanbad-pathardih-sindri road (2 x 14.6m and (ii) cont. of h.l. bridge with approach road over chas nala at 7th km of dps road (1 x 14.6m) under plan head for the year 2025-26.
Read moreCwek/token-14/874 ews/2025-26 spl repair to road and hardstanding in the aor of age br i, repair to certain internal roads in the aor of age br ii and repair to certain internal roads and hardstanding in the aor of age br iii under ge 874 ews
Spl repair to road and hardstanding in the aor of age br i, repair to certain internal roads in the aor of age br ii and repair to certain internal roads and hardstanding in the aor of age br iii under ge 874 ews
Read moreShifting of utility line of dws passing along the proposed road from shyamali bazar sainik board to g.b trauma centre left side
Estimate for shifting of utility under dws sub division no iii kunjaban agartala of dws department for road widening by pwd from shyamali bazar sainik board to gb trauma centre during the year 2024 25
Read moreAAAAAAAAAA
Login to viewPatch repairing work from chainage 2.00 kmp to 5.00 kmp and 12.00 km to 15.00 km in stretches of nalhati rajgram road under rampurhat highway sub-division of birbhum highway division-i in the district of birbhum during the year 2025-26
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreof your Industry type