Tender Details
About Tender
🛣️ Invitation For Bid: Special Strengthening Work On Border Roads 🛣️ The Public Works Department (Roads And Bridges), State Government Of Rajasthan, Invites Bids For The Special Strengthening Work On The Bhonra Minapur Bamori Vishanwada Stretch Of The Rajasthan Border Road (Rbr) From Km 37 To 44 And From Km 64 To 78, Totaling 23.10 Km Under The Mdr, Along With The Anarad To Nihaldevi Road Stretch Of 2.80 Km. 📅 Bid Submission Deadline: June 05, 2024, 5:30 Pm Tender Fee: Inr 21,534 Earnest Money Deposit (Emd): Inr 74,171 Interested Bidders Must Possess The Requisite Expertise And Experience In Road Construction And Strengthening Projects. Bids Should Be Comprehensive, Detailing The Methodology, Materials, Timelines, And Costs For The Execution Of The Work. Keywords: Special Strengthening Work, Border Roads, Pwd Roads And Bridges, Rajasthan, Road Construction, Infrastructure Project, Tender, Bid Submission, Emd, Earnest Money DepositParticulars | Details |
---|---|
Title |
Special Strengthening Work Bhonra Minapur Bamori Vishanwada Rajasthan Border Road (Vishanwada Bhonra Hamirpur Via Kohan) Km 37 To 44 And 64 To 78 Length 23.10 Km (Mdr) And Anarad To Nihaldevi Road Length 2.80 Km (Total Length 25.90 Km)
|
Description |
Special Strengthening Work Bhonra Minapur Bamori Vishanwada Rajasthan Border Road (Vishanwada Bhonra Hamirpur Via Kohan) Km 37 To 44 And 64 To 78 Length 23.10 Km (Mdr) And Anarad To Nihaldevi Road Length 2.80 Km (Total Length 25.90 Km) First Call
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id | 2024_PWDRB_343963_1 |
Reference Number |
NIT No 10/2023-24 |
Tender Fee | 21534 |
EMD | 7.42 Lakh |
Tender Value | |
Place | GUNA |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=407188 |
Start Date | March 16, 2024 16:00 |
End Date |
05/06/2024 ( Expired 346 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bt. renewal work on riniya, sarsi, naktara length 3.00 km., heeralal tapra road length 1.00 km. and mohanpura to shamshabad road length 1.10 km. total length 5.10 km.
Bt. renewal work on riniya, sarsi, naktara length 3.00 km., heeralal tapra road length 1.00 km. and mohanpura to shamshabad road length 1.10 km. total length 5.10 km.
Read moreWidening and strengthening work of meharma bypass ing from sidhokanho chowk to meet at ch. 11.2 at meharma from km 9.300 to km 11.200 of nh-133 (total length- 1.710 km).
Widening and strengthening work of meharma bypass ing from sidhokanho chowk to meet at ch. 11.2 at meharma from km 9.300 to km 11.200 of nh-133 (total length- 1.710 km).
Read moreUpgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Upgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Read moreIrqp work of doranda-sankh-vendro-patna road mdr-114 from km 0.00 to 22.40 km total length 22.40 km under road division, koderma
Irqp work of doranda-sankh-vendro-patna road mdr-114 from km 0.00 to 22.40 km total length 22.40 km under road division, koderma
Read moreIrqp work of bus stand to police line via housing colony road (length- 1.10 km) , housing colony road (length 2.80 km) and dhanbad link road (length 1.50 km) total length 5.40 km under plan head for the year 2025-26.
Irqp work of bus stand to police line via housing colony road (length- 1.10 km) , housing colony road (length 2.80 km) and dhanbad link road (length 1.50 km) total length 5.40 km under plan head for the year 2025-26.
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).
Read moreWidening and strengthening work in chainage 0.000 to 18.800 of atarra oran chausad road -length 18.800 km- utility shifting -work of removal of electric poles etc-
Widening and strengthening work in chainage 0.000 to 18.800 of atarra oran chausad road -length 18.800 km- utility shifting -work of removal of electric poles etc-
Read moreUtility shifting work for widening and strengthening of bagbada uttarakhand border road from km 38 of nh-87 to gurudwara via dibdiba chanden
Utility shifting work for widening and strengthening of bagbada uttarakhand border road from km 38 of nh-87 to gurudwara via dibdiba chanden
Read moreUpgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Read morePeriodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Read moreof your Industry type