Tender Details
Particulars | Details |
---|---|
Title |
Shuttle Lock Consisting Of Four Leg Lamination Anchor With Pyramid System Height 25mm Max Body Weig
|
Description |
|
Organisation | Department of Defence | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 05, 2025 17:24 |
End Date |
26/06/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shuttle lock consisting of four leg lamination anchor with pyramid system height 25mm max body weig
Read more
Piston with pin and lock complete set of four pc std,piston ring set four pc std,cylinder sleeve or
Read more
Hsk-a-63 side lock e/mill holder with clamping dia 25mm body dia 65mm x gpl-110mm approx. make-falc
Read more
Purchase of four e-card with hydraulic system for parulia g p swm project
Purchase of four e-card with hydraulic system for parulia g p swm project
Read moreInstallation of 100 mm dia four leg three leg for bts and one leg for rf antenn) 6.00 mtr height g.i pipe for roof tower and its associated works at 1. satkariya bts and one other places in saharsa district under darbhanga ba 2nd call
Installation of 100 mm dia four leg three leg for bts and one leg for rf antenn) 6.00 mtr height g.i pipe for roof tower and its associated works at 1. satkariya bts and one other places in saharsa district under darbhanga ba 2nd call
Read moreUrgent departmental estimate for repairing of hywa back dala load body of jh10ak-1484 and jh10ad-6805 along with repairing and overhauling of wheel assy., brake system and other mechanical jobs etc. of dugda coal washery.
Urgent departmental estimate for repairing of hywa back dala load body of jh10ak-1484 and jh10ad-6805 along with repairing and overhauling of wheel assy., brake system and other mechanical jobs etc. of dugda coal washery.
Read morePit commissioning of ivrf ac system in g4 building under construction in tripura high court agartala along with operation and cam for 4 four years following and after installation and commissioning of the system
Pit commissioning of ivrf ac system in g4 building under construction in tripura high court agartala along with operation and cam for 4 four years following and after installation and commissioning of the system
Read moreThrough elbow joint lt and rt,lamination anchor with threaded connector three leg,lamination anchor
Read more
Arrangement of supply of water with water pipe line for air conditioning system on terrace of four storied building at umang bhawan, university of delhi.
Arrangement of supply of water with water pipe line for air conditioning system on terrace of four storied building at umang bhawan, university of delhi.
Read moreComplete ep lab consisting of ep recording system with stimulator, rf generator, advance 3d cardiac electro anatomical mapping system and irrigation pump
Complete ep lab consisting of ep recording system with stimulator, rf generator, advance 3d cardiac electro anatomical mapping system and irrigation pump
Read moreof your Industry type