Tender Details

Particulars Details
Title
Shuttle Lock Consisting Of Four Leg Lamination Anchor With Pyramid System Height 25mm Max Body Weig
Description
Organisation Department of Defence | Ministry of Defence
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee
EMD
Tender Value
Place
Link

AAAAAAAAAA

Login to view
Start Date June 05, 2025 17:24
End Date

26/06/2025 ( 19 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 1 Lakhs Experience with Gov. Required: Years
Buyer Details
Name: ***********
Address: *********** PUNE
Ministry: Ministry Of Defence
Department: Department Of Defence
Organisation: Dg Armed Forces Medical Service
Office Address: ***********
Similar Tenders
Purchase of four e-card with hydraulic system for parulia g p swm project

Purchase of four e-card with hydraulic system for parulia g p swm project

Read more
Installation of 100 mm dia four leg three leg for bts and one leg for rf antenn) 6.00 mtr height g.i pipe for roof tower and its associated works at 1. satkariya bts and one other places in saharsa district under darbhanga ba 2nd call

Installation of 100 mm dia four leg three leg for bts and one leg for rf antenn) 6.00 mtr height g.i pipe for roof tower and its associated works at 1. satkariya bts and one other places in saharsa district under darbhanga ba 2nd call

Read more
Urgent departmental estimate for repairing of hywa back dala load body of jh10ak-1484 and jh10ad-6805 along with repairing and overhauling of wheel assy., brake system and other mechanical jobs etc. of dugda coal washery.

Urgent departmental estimate for repairing of hywa back dala load body of jh10ak-1484 and jh10ad-6805 along with repairing and overhauling of wheel assy., brake system and other mechanical jobs etc. of dugda coal washery.

Read more
Pit commissioning of ivrf ac system in g4 building under construction in tripura high court agartala along with operation and cam for 4 four years following and after installation and commissioning of the system

Pit commissioning of ivrf ac system in g4 building under construction in tripura high court agartala along with operation and cam for 4 four years following and after installation and commissioning of the system

Read more
Arrangement of supply of water with water pipe line for air conditioning system on terrace of four storied building at umang bhawan, university of delhi.

Arrangement of supply of water with water pipe line for air conditioning system on terrace of four storied building at umang bhawan, university of delhi.

Read more
Complete ep lab consisting of ep recording system with stimulator, rf generator, advance 3d cardiac electro anatomical mapping system and irrigation pump

Complete ep lab consisting of ep recording system with stimulator, rf generator, advance 3d cardiac electro anatomical mapping system and irrigation pump

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise